few things are as exciting as the challenge of a blank page
it’s a factory that doesn’t exist
and she has to build it from the ground up
She already had one under her belt when she moved to Campos dos Goytacazes in Rio de Janeiro
the blank page is a person she’s training
As the Quality Head of Campos dos Goytacazes
she has developed many employees over the years
a role that she considers an extension of the mentors who once trained her
and I learned a lot with them: how to be strong and achieve the task,” Márcia said
“This is something that I cannot keep only with me
But perhaps the biggest challenge she has faced so far began in April 2020
in the early days of the COVID-19 global pandemic
Nobody had ever seen the virus or knew how to prevent it
“It was a hard time for me and all the people in the factory
Nobody knew the precautions we should take,” Márcia recalled
she worked hard to help people understand how they could best protect themselves and each other
leading trainings about new procedures of social distancing
She was proud of how people began to embrace the education and hold each other accountable for taking the precautions
“It wasn’t just managers monitoring,” Márcia said
“The employees looked out for each other
Everybody should take care of each other.”
When vaccines became available in early 2021
Márcia – who was worried for the safety of people working in the plant – started a series of conversations with government officials who were coordinating the city’s immunization plan
working to secure vaccines for the employees
Márcia worked to demonstrate the importance of the site and its role in producing products needed for COVID-19 treatment
presenting analyses that bolstered her case
paving the way for all employees to have access to preventive vaccines at work
Several workers reached out to Márcia after they were immunized to thank her for fighting for them
I have known these people since the beginning
I can’t sleep,” Márcia said
all these people … I was keeping my family safe.”
is moored roughly 125 km (77.7 mi) offshore Macaé
It has capacity to process 150,000 b/d of crude
mobilization and installation of the vessel and its topsides processing equipment and hull
The company’s subsidiary SOFEC designed and supplied the spread mooring
This is the 12th FPSO MODEC has delivered to the Brazilian sector
The dates displayed for an article provide information on when various publication milestones were reached at the journal that has published the article
activities on preceding journals at which the article was previously under consideration are not shown (for instance submission
VaccineCitation Excerpt :We also include the indicator COVAX to test the hypothesis that US citizens are willing to donate less money to COVAX relative to a generic coalition given the public controversy between President Donald Trump’s administration and WHO amid the pandemic
This proposition is consistent with prior studies that have observed that individuals may be less likely to support proposed programs if they have low levels of trust in the organization overseeing its management (e.g
this hypothesis remains to be empirically tested
Ocean and Coastal ManagementCitation Excerpt :In Puerto San José
citizens are indifferent between an interinstitutional committee and MARN to manage the proposed fund
whereas residents of Iztapa prefer an interinstitutional committee over MARN
While prior studies have elicited preferences for management approaches (e.g
including the preferred composition of an interinstitutional committee
(2022) found that residents of the State of Rio de Janeiro
were indifferent between the state government and an interinstitutional committee to administrate a SLR fund
this is the first study showing that preferences for governance approaches are relevant in the context of coastal management
Energy for Sustainable DevelopmentCitation Excerpt :Prior studies indicate that individuals can be impatient to observe environmental improvements (Kahn et al.
there is also evidence that individuals may have nonlinear time preferences
particularly when longer times are found more credible (Vásquez & De Rezende
we do not have an apriori expectation on the effects of those time indicators
Ocean and Coastal ManagementCitation Excerpt :While we did not find that implementing that committee would increase the willingness to pay
our survey results indicate that citizens prefer an equal distribution of decision-making power across several institutions including universities
Vásquez and Rezende (2018) found similar preferences for an interinstitutional committee to administrate a project aimed at improving the water quality of urban lakes in Campos dos Goytacazes
a municipality in the Rio of Janeiro State
Raising awareness of potential SLR risks for the area would be a complementary strategy to gather public support and funding for SLR adaptation measures
All content on this site: Copyright © 2025 Elsevier B.V.
children and adolescents at the Salesian Youth Centre in Campos dos Goytacazes
participated in the second edition of the "Don Bosco Global Youth Film Festival" (DBGYFF)
The screenings took place in the morning and also in the afternoon as the children came in
around 120 children and adolescents enjoyed the 4 short films screened: "Nothing is Lost"
"The Baker" and "Tijolos do Amor" -all of them Brazilian productions
The screening of the short films generated a favourable environment to discuss the love that builds Peace and Solidarity
which is the theme of this second edition of the festival
ANS - “Agenzia iNfo Salesiana” is a on-line almost daily publication
the communication agency of the Salesian Congregation enrolled in the Press Register of the Tibunal of Rome as n 153/2007
This site also uses third-party cookies to improve user experience and for statistical purposes
By scrolling through this page or by clicking on any of its elements
Brazilian state-owned energy giant Petrobras has awarded several new contracts to CHC do Brasil
CHC revealed on Friday that it had signed five exclusive contracts with Petrobras
the firm did not disclose the exact value of these agreements
which have been secured for offshore transportation of passengers and small loads to the Campos Basin – the main sedimentary area already explored off the Brazilian coast – for the next 4-5 years
CHC’s Director of Operations in Brazil
commented: “These new contracts wins are a testament to the fantastic and hard-working team we have here in Brazil
We are incredibly proud to have been chosen by Petrobras for this project in Campos and Vitória Basin
Supporting energy production is a core specialism of CHC and we are committed to growing our operations in Latin America over the coming years.”
The helicopter operator explains that these projects
which are expected to start in the second half of 2023
were awarded as the result of “a competitive tender” held in August 2022
CHC Brazil will operate five Leonardo AW139 helicopters from new bases located at Campos dos Goytacazes
and Bartolomeu Lisandro Airport and Eurico de Aguiar Salles Airport in Vitória
CHC expects to grow its fleet to around ten medium and large aircraft with these new contract wins
with the helicopter operator raising its headcount to approximately 280 employees in Brazil
CHC highlights that it has “significant long-term growth plans” for Latin America while it already has operations in Brazil and Mexico
having previously also operated in Suriname
Regarding CHC’s recent deals elsewhere, it is worth noting that the helicopter operator won a contract in October 2022 for offshore transport services in the Dutch sector of the North Sea
Daily news and in-depth stories in your inbox
The Pioneers of Offshore Engineering GustoMSC
part of NOV’s Marine and Construction business
is recognized for providing advanced design & engineering consultancy for mobile offshore units and reliable equipment
and technical knowledge into realistic & innovative ideas
The performance of new and existing jack-ups
The Ramada Hotel & Suites Campos dos Goytacazes is located in the neighborhood of Pelinca
of one of the largest oil-producing cities in the country and key commercial and educational hub of the state of Rio de Janeiro
Click here to join your colleagues and stay up to date on the latest hotel news and trends
Copyright © Hotel News Resource & Nevistas | All rights reserved
The arrangement adds a new upstream player to Brazil
also strengthening the company’s deepwater E&P partnership strategy
Petrobras will retain a 50% stake and operation of both fields
Tartaruga Verde started production in June 2018 and has a current output of around 103,000 b/d of oil and 1.2 MMcm/d of gas
Module III is an area that will be developed in integration with the Tartaruga Verde facilities
Brazilian oil major Petrobras has begun the binding phase related to the sale of 50% of its non-operated working interest in Tartaruga Verde field and Module III of Espadarte field
both located in the Campos Basin off Brazil
Petrobras said on Monday that process letters were issued to qualified interested parties with detailed instructions about the divestment process
in addition to guidelines to conduct due diligence and submit binding proposals
“The disclosure to the market herein is in compliance with Petrobras’ divestment methodology and aligned with the provisions of the special procedure for the sale of exploration
natural gas and other fluid hydrocarbons rights,” Petrobras added
It is worth reminding that the company started a non-binding phase for the sale of the Bauna, Tartaruga Verde (Green Turtle), and Module III of Espadarte field in June this year
Petrobras has a 100% working interest in both fields and will remain the operator if the sale of the stake is successful
Worth mentioning, Petrobras kicked off oil production from Tartaruga Verde field on June 22, 2018
All of the field production will be offloaded by FPSO Cidade de Campos dos Goytacazes
Moored approximately 125 kilometers from Macaé
State of Rio de Janeiro in the southeast coast of Brazil
the FPSO is capable of processing 150,000 barrels of crude oil per day
176 million standard cubic feet of gas compression per day and has a storage capacity of 1,600,000 barrels of crude oil
Brazil’s Petrobras has kicked off oil production from its Tartaruga Verde (Green Turtle) field in the Campos basin
The oil company said the production started on Friday
via the FPSO Cidade de Campos dos Goytacazes
The FPSO is located about 127 km off the coast of the state of Rio de Janeiro
with a capacity to process daily up to 150 thousand barrels of oil and 3.5 million cubic meters of gas and 5 million cubic meters of gas compression
Tartaruga Verde field has good quality oil (27º API) and is located in the southern area of Campos Basin
in water depth ranging from 700 to 1,300 meters and with reservoirs at 3,000 meters depth
represented by Pre-Sal Petróleo SA – ‘PPSA’
This is the second platform to start operations this year and will contribute to the increase of Petrobras’ production under the 2018-2022 Business and Management Plan
who said that the first oil marks the start of the unit’s 20-year time charter contract with Petrobras
BHP has proven more gas in the deepwater Magellan play offshore Trinidad and Tobago
drilled by the Transocean drillship Deepwater Invictus
was a follow-up to the earlier LeClerc find in the area
The rig was next due to drill the Bongos prospect for BHP north of Trinidad and Tobago
ExxonMobil has contracted SBM Offshore to perform front-end engineering and design (FEED) for a second FPSO for the deepwater Liza development offshore Guyana
This will be based on the contractor’s Fast4Ward concept
a newbuild hull supporting standardized topsides modules
It will be designed to produce 220,000 b/d of oil with gas treatment of 400 MMcf/d and water injection of 250,000 b/d and will be spread-moored in 1,600 m (5,249 ft) of water
The drillship Stena Carron was due to spud a well on the Hammerhead prospect
after delivering an eighth discovery on the Stabroek block for the partners
Longtail-1 in 1,940 m (6,365 ft) of water in the southeastern part of the Stabroek block
intersected 78 m (256 ft) of oil-bearing reservoir
ExxonMobil estimates combined resources with the nearby Turbot find at over 500 MMboe recoverable
The FPSO Cidade de Campos dos Goytacazes MV29 has produced first oil for Petrobras from the Tartaruga Verde field in the Campos basin
The location is in 765 m (2,510 ft) of water
125 km (78 mi) from the Rio de Janeiro state coast
MODEC built and is operating the vessel under a leasing arrangement: it can process 100,000 b/d of crude
FPSOCidade de Campos dos Goytacazes MV29.(Courtesy MODEC)
Tartaruga Verde is one of the fields in which Petrobras is auctioning interests under its ongoing sales process
the others being Module III of Espadarte in the deepwater Campos basin
and the shallow-water Baúna field (the company’s entire interest) in the Santos basin
Premier Oil has issued a letter of intent for Dril-Quip Europe to provide 23 subsea production systems and ancillaries for the first-phase Sea Lion oilfield development in the offshore North Falkland basin
Dril-Quip expected to start pre-sanction engineering work this month – assuming the Sea Lion partners commit to the development
the company would also provide vendor financing for part of the contract
Eni has produced first gas from the Sankofa field
part of the Offshore Cape Three Points development offshore Ghana
Four deepwater subsea wells are connected to the FPSO John Agyekum Kufuor
with production heading through a 60-km (37-mi) subsea pipeline to the onshore reception plant in Sanzule for compression and distribution through Ghana’s grid
The field should provide 180 MMcf/d for at least 15 years
First Exploration & Petroleum Development Co
has entered a heads of terms with Malaysian contractor Yinson on the supply and charter of an FPSO for the Anyala and Madu fields in the Niger Delta
First had signed a tripartite development agreement for the fields with NNPC and Schlumberger
BW Offshore’s FPSO BW Adolo was due to arrive at the Tortue field in the Dussafu permit offshore Gabon after sailing from Singapore
The vessel has capacity to produce 40,000 b/d of oil and to store 1.35 MMbbl
SOCO is selling its share in SOCO Congo and associated interests offshore Congo (Brazzaville) to Coastal Energy
The transaction includes an overriding royalty on future oil and gas produced from fields in the shallow-water Lideka
Eni has discovered more oil in the prolific block 15/06 off Angola
The drillship West Gemini drilled the Kalimba-1 NFW well in 458 m (1,502 ft) of water
50 km (31 mi) southeast of the block’s East Hub FPSO
Eni estimates in-place resources in the range 230-300 MMbbl of light oil and plans studies for a fast-track development
co-owned by the Croatian state and Hungary’s MOL Group
its partner in various gas production projects in the offshore northern Adriatic and Marica fields
INA would thus gain sole ownership and operatorship of the fields
which respectively export gas to Croatia and Italy
Ivana platform complex in the northern Adriatic Sea
Eni and INA have also entered a memorandum of understanding on studies for a potential offshore gas interconnector
This would extend use of the existing offshore production infrastructure to gas transport between the two countries
Energean plans to drill an exploration well on the deepwater Karish North gas prospect offshore Israel
just prior to the start of the three-well development next year of the adjacent Karish Main field
The company estimates potential resources in the structure at 1.2 tcf of gas and 14 MMbbl of light oil
The Karish FPSO has capacity to accommodate future tie-ins
the joint venture between Eni and state oil company NOC
has delivered first gas from the Bahr Essalam Phase 2 project
120 km (75 mi) northwest and offshore of Libya’s capital Tripoli
lifting output from the country’s largest producing gas field to 400 MMcf/d
The gas heads to the Sabratha platform for onward export to the Mellitah onshore treatment plant
Petrobel has contracted a consortium of Saipem and Petroleum Marine Services to provide life of field operations for the deepwater Zohr gas field development offshore Egypt
PMS’ DP-2 vessel Ahmed Fadel will support operations
with Saipem subsidiary Sonsub managing the field’s subsea equipment
BGP and Spectrum Geo recently started acquisition of a three-month 7,000-km
(4,349-mi) 2D multi-client survey offshore northern Turkey
One of the goals is to improve definition of promising structures in the eastern part of the Black Sea
BP has initiated gas production from the $28-billion Shah Deniz 2 project offshore Azerbaijan
the first subsea development in the Caspian Sea
two bridge-linked platforms and 500 km (310 mi) of flowlines
will supply 16 bcm/yr to supplement current production from the Shah Deniz field
sent to the upgraded Sangachal terminal near Baku
will eventually head to markets in southern Europe via new long-distance overland/offshore trunkline systems
SNC-Lavalin Engineers and Construction has a new five-year framework agreement to provide general engineering to Al Khafji Joint Operations (KJO)
the joint venture between Saudi Aramco and Kuwait Gulf Oil
The contractor will perform services for new projects in the joint offshore Kuwait/Saudi zone
and upgrades to KJO’s existing offshore facilities
ADNOC has issued contracts with a combined value of up to $1.6 billion for what it claims will be the world’s largest continuous offshore/onshore 3D survey
BGP will acquire up to 30,000 sq km (11,583 sq mi) of seismic data offshore Abu Dhabi and 23,000 sq km (8,880 sq mi) onshore
applying techniques claimed to provide data density up to five times existing standards over the complex subsurface area
has awarded an EPCC contract to NPCC for the full development of the Bu Haseer field offshore Abu Dhabi
NPCC will construct and install offshore facilities designed to double present production to 16,000 b/d in 2020
The Mozambique Rovuma venture has submitted its first-phase development plan for the Rovuma LNG project to Mozambique’s government
The offshore facilities will produce gas from the giant Mamba fields in deepwater Area 4
with output sent to two onshore LNG plants
Eni will lead offshore construction with ExxonMobil managing the onshore program
POSCO Daewoo has contracted McDermott and Baker Hughes
a GE company to supply subsea architecture for the Shwe gas field development offshore western Myanmar
BHGE will provide the subsea production system
including eight medium-water horizontal xmas trees
McDermott’s EPCIC scope covers the subsea umbilicals
with all structures to be manufactured in the Asia/Pacific region
and brownfield modifications at the existing Shwe platform to accommodate the tiebacks
Royal Boskalis Westminster has a letter of award from Malaysia Marine and Heavy Engineering (MMHE) covering transportation and installation of a topsides for the Bokor central processing platform phase 3 redevelopment offshore Malaysia
MMHE will build the topsides in country for subsequent skidding onto an open stern heavy transport vessel
CNOOC has signed a production-sharing contract with Roc Oil (Bohai) and Smart Oil Investment for the Weizhou 10-3W oilfield and block 22/04
Both are in the Beibu Gulf basin in the South China Sea
in water depths ranging from 40-80 m (131-262 ft)
If exploration leads to commercial discoveries
CNOOC will take over as operator for the development
MODEC is performing FEED in competition with other parties for ConocoPhillips’ Barossa gas/light condensate development
The operator plans a subsea production system and pipeline exporting the gas to the Darwin LNG facility
a GE company two contracts for the second development phase of the Greater Gorgon area
130-220 km (81-137 mi) offshore Western Australia’s northwest coast
One contract involves the supply of 13 subsea production trees
two eight-slot manifolds fatigue-resistant wellheads and subsea controls
five-year contract covers the supply of well completion equipment and associated services
Gorgon Stage Two will expand the subsea gas-gathering network to maintain long-term gas supplies to the 15.6 MMt/yr LNG plant and domestic gas plant on Barrow Island
via new wells on the Gorgon and Jansz-Io fields
Quadrant Energy/Carnarvon Petroleum have discovered light oil with a well on the Dorado prospect offshore Western Australia
Carnarvon described the find as significant
due to the net pay of around 80 m (262 ft)
the oil quality and the reservoir characteristics
SINGAPORE – Keppel FELS Brasil’s BrasFELS shipyard has completed integration works on the FPSOCidade de Caraguatatuba MV27 for MODEC Offshore Production Systems (Singapore)
The vessel arrived at BrasFELS from Singapore during 2Q
having earlier undergone first-phase integration works at Keppel Shipyard
Following completion of BrasFELS’ scope of work, the vessel was towed offshore to support Petrobras’ operations on the Lapa (ex-Carioca) oil field in the Santos basin
This is the fourth MODEC FPSO to undergo integration and completion works at BrasFELS since 2012
All four projects were completed ahead of schedule
FPSOCidade de Caraguatatuba MV27 has an oil processing capacity of up to 100,000 b/d
BrasFELS and MODEC are already collaborating on a fifth project concerning theFPSOCidade de Campos dos Goytacazes MV29
Here BrasFELS is responsible for fabrication and integration of nine topsides production modules
The vessel is expected to arrive at the shipyard by 1Q 2017
Share your news withOffshore at [email protected]
Nossos serviços estão apresentando instabilidade no momento
Algumas informações podem não estar disponíveis
2023 10h00 AM | Last Updated: December 20
Data released today (15) by the IBGE show that
the five municipalities with the biggest increases in the share of Gross Domestic Product (PIB) in Brazil were Maricá (RJ)
with an increase of 0.5 percentage points; Saquarema (RJ)
with +0.2 percentage points; São Sebastião (SP) and Campos dos Goytacazes (RJ)
Ampong the 25 municipalities with the biggest share of GDP
the new municipalities are Maricá (RJ) and Itajaí (SC)
whereas Sorocaba (SP) and Uberlândia (MG) left the list
with a decrease of 0.6 percentage points in participation; Rio de Janeiro (RJ)
-0.3 percentage points; Belo Horizonte (MG) and Porto Alegre (RS)
both with -0.1 percentage points accounted for the main five drops in share of the GDP
“These results show economic recovery of capitals and other aggregates with biggest participation in the Brazilian GDP
having face-to-face services as their main activity
were strongly affected by the COVID-19 pandemic
despite the nominal increase of this group of municipalities in 2021
their participation in GDP is still beyond the level of 2019,” says Luiz Antonio de Sá
“The good performance of Maricá (RJ) was due to the extraction of oil and gas
The five municipalities with a decrease in participation were influenced by Services
insurance and related services in São Paulo and Porto Alegre
Public administration in Brasília and Belo Horizonte
administrative and related services in Rio de Janeiro,” Luiz Antonio Sá explains
11 municipalities accounted for almost 25% of the national GDP and for 16.6% of the Brazilian population
whereas the 87 with the highest GDP figures accounted for approximately 50% of the total GDP and for 36.7% of the population in the country
only four municipalities together represented about ¼ of the national economy
The municipalities accounting for about ¼ of the GDP in 2021 were: São Paulo (SP)
Manaus (AM) went from the seventh to the fifth position; Curitiba (PR)
from the 354th to the eighth; whereas Porto Alegre (RS) went from the sixth to the ninth position; Guarulhos (SP)
from the 14th to the 10th and Fortaleza (CE)
Economic deconcentration intensified in 2020 remains
The trend to relative decrease of the economic relevance of major urban centers remained in 2021
The main two urban concentrations in Brazil amounted to 23.2% of share of the GDP after adding up to 23.6% in 2020
São Paulo/SP started accounting for 15.4% of the Brazilian GDP
This result was the most significant drop among all urban concentrations
having changed from 7.4% to 7.8% of the Brazilian GDP in 2021
That was the main advance observed among urban concentrations that expanded participation in the GDP from 2020 to 2021
Among the 185 urban concentrations existing in the country in 2021
132 reduced and 53 increased their share of the national GDP
thus confirming the trend to deconcentration
The biggest urban concentrations recorded the biggest losses
Among the 53 increasing their participation
only 6 were considered to be big urban concentrations (from a total of 26)
Only 47 medium urban concentrations recorded increases in participation in GDP in 2021 (from a total of 159)
Central South area has GDP above the average in Brazil
the three municipalities in the country with the highest per capital GDP figures were Catas Altas (MG)
with R$ 894,806.28 and São Gonçalo do Rio Abaixo (MG)
The three municipalities have mining and quarrying industry as their main economic activity
Three municipalities in Maranhão had the lowest per capita GDP figures in 2021
Public administration is the predominant economic activity
The highest per capita GDP figures in 2021 belong to big urban centers in the Central-South area and to some other where Agriculture is present for a significanr but small population
municipalities in the south of goiás and east of Mato Grosso do Sul
in the west of Bahia and the upper course of Parnaíba River
The calculation of per capita GDP uses estimated of the resident population for July 1st
submitter by the IBGE to the Federal Court of Accounts (TCU)
the highest ratio of per capita GDP was registered in the urban concentration of Campinas/SP
This scenario is similar to that observed in 2002
despite the change in order of big urban concentrations in the ranking
besides the exit of Curitiba/PR from the list and the incluision of Sorocaba/SP in it
the highest ratios for per capita GDP recorded significant decreases
13 big urban concentrations had a per capita GDP above the national average
the others were found in the Southeast and South Regions
14 urban concentrations had a ratio above 1,0
Some of the biggest urban concentrations in the North and one in the North
were far from the national average throughout the period
Goiânia/GO in the Central West and Belém/PA in the North Regions
The reduction of regional inequality of per capita GDP in 2021 can be also seen in the Semiarid regions
the Legal Amazon and the CIty-Area of São Paulo
the per capita GDP ratios of the Semiarid Region and of the Legam Amazon were
the per capita GDP ratio for the Semiarid region was 0.43 and that for the Legal Amazon was 0.75
The per capita GDP ratio went on advancing in the Legal Amazon
but it oscillated downwards in the Semiarid area in 2021
corresponded to 1.85 of the national value in 2002
City-Area of São Paulo concentrates 22.6% of the national GDP
The City-Area of São Paulo faced a reduction in the share of national GDP
with a change from 23.5% of the GDP in Brazil of Brazil
which means a decrease of 0.9 percentage points
the Legal Amazon increased its participation from 9.9% to 10.1%
“The City-Area of São Paulo has reduced its participation throughout the time series and reinforced that trend in 2021
the increase of Agriculture was an important factor
which since 2013 had been increasing in participation
The decrease in share of national GDP of Services affected the municipalities that have this activity as the most relevant one
as it is the case of the Semiarid area,” says Marcelo Araújo
Public administration and Other services are predominant in the country
Regarding the economic profile of the municipalities
the main activity in 43.2% of them ( 2409 municipalities) was Public administration
Amapá and Paraíba this percentage exceeded 90.0%
had only 6.3% of its municipalities with this characteristic
Of the 358 municipalities whose main activity
293 were in the Southeast and South Regions
Mato Grosso reached the highest percentage of cities in which Agriculture
including support to agriculture and post-harvesting featured as the main activity (56.0%)
followed by Mato Grosso do Sul (53.2%) and Rio Grande do Sul (48.9%)
Excluding from this analysis Public administration
the activity Other services stood out in 3075 municipalities
including support to agriculture and post-harvesting
there was a significant increase in the number of cities with Agriculture as their main activity
which is related to the rise of prices of some farm products of great relevance to the national economy in 2021
Urban concentrations have reduced their participation in the national scenario since 2002
São Paulo (SP) and Rio de Janeiro (RJ) registered the main drops in participation among the Brazilian municipalities
showing a trend to deconcentration of municipal GDP
São Paulo (SP) dropped by 3.5 percentage points as for its participation in national economy
mainly due to the relative drops in Financial activities
the drop of 2.3 percentage points occurred due to the decrease of its weight in Services
mainly the activities of Real Estate and information and Communication
Campos dos Goytacazes (RJ) and Belo Horizonte (MG) follow
both with a decrease of 0.4 pof oil and gas in the former municipality
and or Real Estate activities in the latter
The municipality with the biggest increase in participation in national GDP from 2002 to 2021 was Maricá (RJ)
The municipalities of Parauapebas and Canaã dos Carajás in Pará recorded increases of 0.5 and 0.4 percentage points
placed at the second and fifth positions as for increase in share of the GDP
the increase of 0.4 percentage points was also due to extraction of oil and gas
in the fourth position regarding participation
stood out due to Trade and repair of motor vehicles and motorcycles
the CIty-Area of São Paulo reduced from 27.0% to 22.6% its participation in national GDP
not only due to the reduced GDP share of the capital
but also due to the relative loss of other municipalities that form it and are represented by the Brazilian industry
the Legal Amazon (3.2 p.p) and the Semiarid region (0.9 p.p) have increased their participation since 2002
© 2018 IBGE - Instituto Brasileiro de Geografia e Estatística
Nós utilizamos cookies para melhorar sua experiência de navegação no portal. Para saber mais sobre como tratamos os dados pessoais, consulte nossa Política de Privacidade.