liegt nicht in der gewünschten Sprache vor
Möchten Sie auf die Startseite der gewählten Sprache wechseln
The content you are trying to access is not available in the selected language
Would you like to switch to the home page of the selected language
Climate & Resources
Interiors & Design
Products & References
Videos & Podcasts
Current Issue
Collaborations
Advertorials
Company Portraits
BAU 2025
Detail About Schüco
Detail About Solarlux
BAU 2025
Events
DETAIL Product Award 2023
DETAIL Award 2024
DETAIL Award 2022
Detail Inspiration
DETAIL Magazine
DETAIL Inspiration
DETAIL Books
Contributors
60 Years DETAIL
Digital Lab
DETAIL Product Award 2023
DETAIL Award 2022
Legal Notice Data protection Social Media Media Kit Newsletter
Climate & Resources Interiors & Design Products & References Current Issue Collaborations Events
In the 6500-inhabitant community near Solothurn
Ern+ Heinzl Architects has united local administration offices with a triple sports hall
school and kindergarten into a sculptural multi-purpose building
Eight years of planning and construction work passed between the architectural competition in 2013 and completion of the new complex at the very centre of town – time that was particularly needed to accommodate the wishes and requirements of the town itself and various users
the local power and water supplier and local clubs and associations
The proposal by competition winner Ern+ Heinzl responded to the scattered solitary buildings at the town's centre with a large structure consisting of individual urban space-defining elements differing in form
The town's new centre is thus divided into east and west by two striking three-storey slab blocks built of large pre-cast reinforced concrete units and provided punctuated facades
The west-facing one with a newly-created public forecourt contains the municipal administration complete with council chamber and the premises of the police station; the east-facing one accommodates additional rooms for the local primary school and the kindergarten
The classroom windows look onto the sports grounds that concludes the area to the northeast
Large cantilever structures at both blocks guide visitors and pupils to the respective entrances
complete with a spectator gallery and half-buried in the ground
is set between the two and can be accessed at ground level from the school yard to the south
Reinforced concrete is the predominant construction material – also visually – not only in the multi-storey head buildings but also in the hall
where the primary structural system runs crosswise in the volume and consists of pre-fabricated concrete columns and beams
The latter are arranged in pairs to keep them low in overall height and are topped by pre-fabricated ceiling slabs
According to the WAM structural engineering firm
the high degree of prefabrication enabled swift on-site assembly and installation
load-bearing facades and structural interior columns and walls
solely the corridors and circulation core in the interior are walled in reinforced concrete
Architecture: ern+ heinzl ArchitektenClient: Einwohnergemeinde DerendingenLocation: Friedhofstrasse 35
Structural engineering: WAM Planer und IngenieureLandscape architecture: Bischoff LandschaftsarchitekturBuilding services engineering: EnerconomConstruction management: Jaeger Baumanagement
the Trudo building society along with Stefano Boeri and the local studio Inbo has devised the first vertical forest for social housing along with
Les Coteaux Fleuris is the school designed by Hemaa Architectes in the Norman village of Heudebouville
Inspired by regional typologies and materials
The largest timber-built school in northern Germany has been erected in Rinteln in Lower Saxony
The integrated comprehensive school by Bez + Kock offers space for 900 students and scores in terms of energy efficiency
DETAIL ARCHITECTURE GmbH is a leading international platform for design and construction solutions in architecture
usable information and inspiration to all of the world's leading architects and architectural schools
based on a unique project database with thousands of buildings documented in detail - in DETAIL
EventsDETAIL InspirationDETAIL Inspiration FAQMagazineBooksCollectionCancel Subscription
Social Media
Register now for our newsletter and get a €10 voucher for the DETAIL Shop
By sending this message, I agree that the data provided may be processed and used for the purpose of sending the newsletter. I may at any time revoke my consent. (Data protection)
Industry Trends
Daily Bite
View All White Papers & Case Studies
View All Resources
Select From Over 500,000 Industrial Suppliers
compatible with all major CAD software systems
During a Swiss police operation on Monday in Grenchen and Derendingen
cocaine and hashish were seized and three people were arrested.
Police in the canton of Bern caught a suspected three-person drug-dealing gang and seized more than 13 kilograms of drugs. The operation
which led to house searches and the arrest of three men in the canton of Solothurn on August 29
was preceded by investigations in the canton of Bern
Eight kilograms of cocaine and five and a half kilograms of hash were seized in Grenchen and Derendingen. The three arrested are two Albanians aged 26 and 42 and a 33-year-old Serb
The arrested are accused of qualified violations of the Law on Narcotics
Plenary Session Terminated after Tensions in Assembly Hall
Opposition MPs Climbed through Windows to Enter Assembly Offices
Tirana-Besiktas Match Suspended Due to Incidents
Strong Security Measures for Bill Clinton's Visit in Tirana
DP Accuses PM of Ignoring Albanians Living in Survival Conditions
the current range of models can be test ridden on an 18-kilometer course in Derendingen/SO at Moto Guzzi's motorcycle test days
For bikers who have been waiting a long time for the start of the new season
For bikers who have been waiting a long time for the start of the new season
the grounds of the TCS Traffic Safety Center Derendingen in the canton of Solothurn
are ready and waiting: The new mid-range V9 Roamer and V9 Bobber models with their completely redesigned V2 engines
as well as two versions of the Stelvio 1200 touring enduro
Important info about the Moto Guzzi bike test days Location: Traffic Safety Center VSZ Derendingen/SO
each 18 kilometers on varied routes Information and registration: all details on the Internet
www.toefftesttage.ch Photo: Factory