There are probably not too many climate activists in the small village of Ampfing in Southern Germany
as the information plaques and monuments dedicated to the local history of oil production look unspoiled
Can you even imagine living on Mobil Oil Strasse – Mobil Oil Street
The village appeared on the exploration radar in the 1950’s
when the results of a seismic survey suggested the presence of a valid closure at Eocene level – at a depth of around 2,000 m
Subsequent drilling of the Ampfing-1 well in 1953 proved the presence of oil shows
but it was the second well that brought the success that was hoped for
the sandstone in which the oil was found was named the Ampfing Sandstone
which is still known as a stratigraphic name today
a nationwide gas distribution system was built
This meant that Bavaria could say goodbye to gas generated from coal
which can in some ways be seen as the first step in the energy transition
around 26 million barrels of oil and 13.9 billion cubic meters of gas were produced from the Bavarian oil and gas fields together
Production from most fields started to become marginal in the 1980’s and 1990’s
as a new attempt to revive production was made in 2016 when RDG – a spin-off from RAG Austria – drilled a new well into the field
A 3D seismic survey and more wells followed
but the production test in 2020 ultimately put a stop to further development as it was regarded uneconomic in the end
it was not the end of Ampfing’s link to the deep subsurface
ONEO – formerly RDG – now aims to produce geothermal energy from the Upper Jurassic Malm that can be found beneath the Ampfing sandstone
the company aims to deepen one of the wells recently drilled into the field
A feasibility study has shown that between 19 and 24 MWth could be produced from the doublet
This is partly thanks to the relatively high geothermal gradient of around 40°C per km and the fact that the Malm carbonates tend to have good porosities and permeabilities in Bavaria
Henk KombrinkHenk.Kombrink@geoexpro.com+44 77 8899 2374
Sales DirectorIngvild Ryggen CarstensSales EnquiriesIngvild.Carstens@geoexpro.com+47 974 69 090
BERLIN (AP) — A vehicle apparently packed with migrants left a highway in southern Germany at high speed on Friday and crashed as the driver tried to evade a police check, killing seven people and injuring 16, authorities said.
The accident happened near Ampfing, east of Munich on the A94 highway, which leads to the Austrian border. The van left the road and overturned.
Police described the van, which had 23 people on board, as “a suspected smuggler vehicle.” They said prosecutors had opened a homicide investigation.
Bavaria’s top security official, state Interior Minister Joachim Herrmann, said that the dead included a young child. The injured were taken to nearby hospitals.
The Austrian-registered van was designed to carry nine people, and it wouldn’t have been possible for many of the people on board to use seat belts, German news agency dpa reported. Police said the vehicle was carrying Syrians and Turks, while the driver was a stateless man resident in Austria.
“The inhuman behavior of the smuggler, who was injured in the accident and wanted to evade being stopped by the federal police just to save his own skin, makes one speechless,” Herrmann said.
Germany has seen large numbers of migrants arriving in recent months. The A94 is known as a smuggling route and the site of the accident is about 50 kilometers (31 miles) from the border with Austria, through which many migrants transit en route to Germany.
Herrmann, whose conservative party belongs to Germany’s main opposition bloc, told dpa that Friday’s incident shows “how important it is to further strengthen immediate border controls in order to stop smugglers already at the border.”
Home Delivery
Gift Subscriptions
Log In
Manage My Account
Customer Service
Delivery Issues
Feedback
News Tips
Help & FAQs
Staff List
Advertise
Newsletters
View the ePaper
Order Back Issues
News in Education
Search the Archives
Privacy Policy
Terms of Service
Terms of Purchase
Work at Boston Globe Media
Internship Program
Co-op Program
Do Not Sell My Personal Information
MAN has equipped the recently established motorway maintenance depot in Ampfing with five MAN TGS vehicles to perform operational services on a section of the A94 motorway from Munich – Passau
The time it takes to drive between Munich and Passau is now shorter since
a 33-kilometre section of the A94 motorway between Pastetten and Heldenstein was opened to traffic
KG is taking over the operational services on a 77-kilometre stretch of the A94
Not only has a new motorway maintenance depot been created at the Ampfing junction (in the Mühldorf am Inn district) for this purpose
but a completely new fleet of vehicles has also been purchased
This is mostly comprised of MAN municipal vehicles from the TGS series
Additions from other manufacturers include a universal vehicle with different equipment
MAN TGS vehicles equipped in line with industry needs
Purchasing the vehicles was preceded by an intensive planning phase in order to determine how the vehicle concept needed to be tailored to the tasks involved
The A94 Isentalautobahn Services fleet includes five MAN TGS vehicles: three 3-axle vehicles and two 4-axle vehicles with the same design
These were purchased with bodies from Aebi Schmidt Deutschland as the general contractor in close collaboration with MAN Truck & Bus Deutschland:
MAN provided all of the vehicles ex works with amber revolving beacons
spotlights and compressed-air horns on the roof of the M cab
along with a front mounting plate for attaching the snow plough and raised winter service lighting
Aebi Schmidt also equipped all the vehicles with a specially adapted load-sensing hydraulic system for operating all of the attachment equipment for summer and winter service
and that is the air suspension on the rear axle
The advantage of this becomes apparent during winter service operations when gritting the road
this has an effect on the angle of the loading surface – and thereby on the angle of the gritting system attached to it – due to the reduced load on the spring leaves
Achieving a uniform gritting pattern throughout the entire gritting run would not be possible without implementing technically complex measures on the gritter
the electronically controlled air suspension installed by MAN is advantageous
as it keeps the loading surface height and its angle constant at all times
This means the gritter can distribute the salt and brine evenly over the entire width of the road from the first to the last kilometre of the run
traction and manoeuvrability were important requirements for the operators; MAN managed to implement these at a technical level ex works
In the 3-axle vehicles with a high design height
the first and centre axles are permanently driven
this chassis combines the payload of a 3-axle vehicle with the manoeuvrability of a 2-axle vehicle and the off-road capability of an all-wheel vehicle
The 4-axle vehicles are configured for maximum manoeuvrability in such a way that three axles are steered
the driven rear axle is assisted by MAN HydroDrive
The hydraulic drive is installed in the second front axle
This makes a normal design height possible
and makes it easier for the driver to get in and out of the vehicle
For smooth operation during snow and low temperatures
the vehicle configuration has a heated windscreen and a flame-start system for improving the cold-start capability
Different factors were considered during the selection and configuration of the vehicles
and there was close collaboration between the operator and suppliers MAN and Aebi Schmidt during the process
Additional sections of road were taken over from neighbouring road maintenance depots
so that a stretch of 77 kilometres is to be maintained
this stretch is to be cleared and gritted starting from the depot in Ampfing without having to stop at an intermediate store to load up on salt and brine
This specification defined the volume that the transport containers needed to have
thereby influencing the size and payload requirements of the vehicles
The two 4-axle vehicles have bodies for 12 m³ of salt and 5,500 litres of brine
these can be exchanged for a tank with a spray device for 15,000 litres of brine
Two of the MAN TGS 28.420 vehicles have capacity for 8 m³ of salt and 5,000 litres of brine
The roll-off skip loader has the smallest body with 7 m³ of salt and 3,000 litres of brine
a state-specific special permit allows the permitted gross weight of a 3-axle vehicle to be increased from the standard 26 tonnes to 29 tonnes during winter service operations
and therefore for a gritter with a greater load volume to be attached (8 m³ instead of 6 m³)
The aim was to enable multifunctional use throughout the entire year; outside of the seasonal winter service activities
a motorway maintenance depot has a very varied range of tasks
The vehicles and their bodies had to be equally suited to ensuring traffic safety in the event of roadworks or accidents
carrying out repairs on this stretch of road
and cleaning the facilities in the parking areas
The two 4-axle vehicles remain unchanged throughout the year
They have warning trailers and serve as safety vehicles
Flexible deployment is ensured through changing the crane tipper body
different tipper bodies are available in addition to the gritter
The stretch of road has two lanes on each carriageway
the right concept for clearing snow is to use two vehicles with extra-wide snow ploughs
This is why Aebi Schmidt installed the load-sensing hydraulic system
The clearing concept is realised using special motorway snow ploughs with length-adjustable blades and a total clearing width of 4.40 metres
Operations on the A94 Isentalautobahn motorway
The new 33-kilometre section of the A94 was created as part of a public-private partnership
KG will be responsible for the operation and upkeep of the entire 77-km long motorway section Forstinning – Marktl
The consortium is comprised of the three construction companies BAM
Berger Bau from Germany and Eiffage from France
This is why the technology – like the fleet – and the services were able to be procured without calls to tender
and ordered already tailored to the tasks involved
haben Verkehrsminister Peter Ramsauer und Bahnaufsichtsratschef Professor Utz-Hellmuth Felcht den zweigleisigen Abschnitt zwischen Altmühldorf und Ampfing eröffnet
**Fotos und Video**","url":"https://www.ovb-online.de/muehldorf/muehldorf/erste-schritt-ausbau-1045032.html"};c&&a.navigator.canShare(d)&&(c.style.display="",c.addEventListener("click",b=>{b.preventDefault(),a.setTimeout(function(){a.navigator.share(d)},0)}))}})(window,document);
Den knapp zwei Dutzend Demonstranten der SPD-Kreisverbände Altötting und Mühldorf blies eiskalter Wind ins Gesicht
Tapfer rasselten sie mit ihren Ketten und stimmten das Lied von der schwäbischen Eisenbahn an
begrüßt von der Blasmusik der Stadtkapelle Mühldorf
Doch nicht lange klangen die musikalischen Misstöne über das Gelände
fand versöhnliche Worte: "Es ist ja schön
dass die Infrastruktur verbessert wird"
sagte der ehemalige Chef des Trostberger Chemieunternehmens SKW und bat die Demonstranten ins beheizte Festzelt am Bahnhof
Dort versammelten sich zahlreiche geladene Gäste
Bayerns Wirtschaftsminister Martin Zeil kam entgegen seiner Ankündigung allerdings genauso wenig wie Bahnchef Rüdiger Grube
Vielleicht ist die aktuelle politische Konstellation trotzdem ein Glücksfall für die Region
Das war zumindest am Rande der Eröffnung immer wieder zu hören: Ein Verkehrsminister aus Traunstein
ein ehemaliger Chemiechef aus Trostberg als Aufsichtsratsvorsitzender der Bahn und 2013
wenn der nächste Ausbau Richtung Tüßling ansteht: Bundestagswahlen
In dieses Bild passten die Aussagen des Samstags
Eine "Mittelaufstockung des Bedarfplans Schiene"
zum "bedarfsgerechten Ausbau der Bahnstrecke" bekannte sich Verkehrsminister Ramsauer
Das gelte zunächst vor allem für den Ausbau zwischen Mühldorf und Tüßling
für den der Planfeststellungsbeschluss 2013 vorliegen soll: "Und dann werden wir auch unverzüglich die dazu notwendige Finanzierungsvereinbarung unterschreiben"
7,8 Kilometer ist der am Samstag eingeweihte
zweigleisige Abschnitt zwischen Altmühldorf und Ampfing lang
von denen der Bund nach Angaben Ramsauers 33,8 Millionen Euro bereitgestellt hat
Als Meilenstein bezeichnete Ramsauer den Ausbau
auch Bayerns Bahnchef Klaus-Dieter Josel betonte mit Blick auf das neue elektronische Stellwerk Burghausen und den Neubau der Ehringer Innbrücke: "Sie sehen
soll Baurecht für den Abschnitt zwischen Altmühldorf und Tüßling gelten
die Pläne seien fertig und würden beim Eisenbahnbundesamt eingereicht
Auch für das dritte Gleis zwischen Freilassing und Salzburg könne es in zwei Jahren Baurecht geben
Der Verkehrsminister hielt am "langfristigen Vorhaben des kompletten Ausbaus und der Elektrifizierung der Strecke" zwischen München und der Grenze mit Österreich fest
Statt wie bisher vom Ausbau zweiter Begegnungsabschnitte zwischen Markt Schwaben und Hörlkofen sowie zwischen Dorfen und Obergeiselbach zu sprechen
erklärte Ramsauer den gesamten Ausbau zum Ziel
Er brachte außerdem einen zweigleisigen Abschnitt zwischen Kirchweidach und Tittmonnig auf der Strecke Richtung Freilassing ins Spiel
durften die Ehrengäste bei einer Fahrt nach Ampfing erleben: Auf halber Strecke überholte ein Güterzug den Regionalzug
Dieser Inhalt"+t(a)+"kann aufgrund Ihrer Datenschutz-Einstellungen nicht geladen werden