Please enable JS and disable any ad blocker
Filing of the 2024 Universal Registration Document
Dassault Systèmes (Euronext Paris: FR0014003TT8
2025 of its French 2024 Universal Registration Document (constituting the Annual Financial Report) with the Autorité des marchés financiers
The following documents are included in the Universal Registration Document in accordance with legal provisions:
Dassault Systèmes Press ContactsCorporate / France Arnaud Malherbe: +33 1 61 62 87 73arnaud.malherbe@3ds.com
You don't have permission to access the page you requested.
What is this page?The website you are visiting is protected.For security reasons this page cannot be displayed.
On October 3rd, the foundation stone of the new Thales building was laid during a ceremony attended by representatives from Thales, the prefect of Hauts-de-Seine, the mayors of Meudon and V�lizy, as well as representatives from partner companies, Covivio and Eiffage Construction.
The new V�lizy-Meudon site builds on the existing site in V�lizy-Villacoublay, which already houses over 3,000 employees. It will thus become the largest Thales site in the world in terms of surface area and workforce: it will cover 110,000 square meters and host more than 5,500 people.
The result of the Group's commitment to innovation, the site aims to become a center of excellence in the field of civil and military flight safety and security. It will develop air traffic management solutions as well as air surveillance and defense systems to ensure nations' sovereignty over their airspace.
The site will promote team cooperation and ensure employees' needs in terms of safety, available equipment, connectivity, and environmental respect. For Herv� Dammann, Deputy General Manager of Thales's Land and Air Systems activities, it is a "bold future we are building together".
Copyright © 2003-2025 AEROCONTACT - All rights reserved
Plus More than 100 Customer-Driven EnhancementsVÉLIZY-VILLACOUBLAY
2010 — Dassault Systèmes (DS) (Euronext Paris: #13065
a world leader in 3D and Product Lifecycle Management (PLM) solutions
today announced the availability of Abaqus 6.10
the leading unified Finite Element Analysis (FEA) and multiphysics product suite for realistic simulation from SIMULIA
In response to expanding industry demand for realistic simulation
the new release delivers on more than 100 customer-requested enhancements for modeling
and researchers in all industries can now perform virtual tests that more accurately predict real-world behavior of materials and product designs
allowing them to improve product performance while reducing development time and cost
Abaqus 6.10 introduces a new multiphysics capability for performing Computational Fluid Dynamics (CFD) simulation
This enables users to perform coupled physics simulations with Abaqus/Standard and Abaqus/Explicit
such as fluid-structure interaction between human tissue
and fluid flow; thermal analysis of electronic systems undergoing convection cooling; or transient thermal analysis of engine exhaust systems.
“In order to simulate performance of engine components in a closer-to-reality environment
we are pleased that Abaqus 6.10 provides the Computational Fluid Dynamic capabilities for fluid-structure interaction which will enable us to perform accurate fluid and solid co-simulations,” said Dr
technical leader of bearing analysis from Federal-Mogul Powertrain Sealing and Bearings Group USA
“The new solution certainly gives us significant enhancements to explore multiphysics interaction in our designs and optimize our products to reduce engine power loss and lower overall material costs.”
The release also reinforces SIMULIA’s commitment to providing an open multiphysics platform through improvements to its direct co-simulation coupling interface
This capability allows SIMULIA partners and customers to couple their applications directly with Abaqus for best-in-class multiphysics simulation
SIMULIA also extends its leadership in the simulation software industry by delivering innovative technology for realistic fracture and failure analysis
Abaqus 6.10 features enhancements to its extended finite element method (XFEM) that improves the process for modeling fracture of composite materials
It also provides dramatic performance improvements for parallel processing of simulations that use XFEM
allowing more simulations to be performed in less time
“It is important to use the best technologies and methods available to assess the safety of nuclear power plant components," stated Dipl.-Ing
"The XFEM capabilities in Abaqus 6.10 will make it easier to perform virtual safety evaluations of nuclear power plant piping systems and pressure vessels
realistic simulation of crack propagation based on both the cohesive segments method and linear elastic fracture mechanics is now feasible
while using the implicit dynamic procedure for improved stability.”
“Responding to our customers’ requests for new and improved capabilities is the key to our strategy of providing the most robust realistic simulation solutions possible while ensuring a high level of customer satisfaction,” stated Steve Crowley
we delivered more than one hundred customer requested enhancements including a unique solution to quickly generate mid-surfaces of thin parts in Abaqus/CAE
This release continues our commitment to enhancing our core mechanics and developing new and industry-leading multiphysics technology that helps our customers become more productive and efficient in evaluating and improving product performance.”
Abaqus 6.10 will be featured at the 2010 SIMULIA Customer Conference (SCC)
Microsoft and CD-adapco are the premier sponsors of the SCC
which will host more than 400 attendees from world-leading manufacturing companies
For the full list of new features and enhancements, visit: www.simulia.com/products/abaqus_fea
Generous outdoor spaces for residents. Just a few steps from the Meudon forest (France), this residence is the expression of contemporary architecture, highlighted by its many outdoor spaces that punctuate the façade.
The project includes two buildings with low-carbon, bioclimatic apartments, with generous outdoor spaces (balconies, terraces, and private gardens) for residents' comfort. A wooden wall is left exposed in each apartment, adding a warm touch. The top floors offer wide views of the 2,200m² landscaped park in the heart of the site. Commercial premises on the first floor bring the new district to life.
© Cyrille WeinerSustainability: wood is at the heart of the project. Wood is at the heart of this housing project. Exemplary in terms of carbon emissions over its entire life cycle, it has been awarded the BBCA (Low Carbon Building) label.
© Cyrille WeinerIt is made of CLT (Cross Laminated Timber) for the floor, façade, and walls from the first floor upwards, and combines bioclimatic design, control energy use, and carbon storage with more than 2,000 m3 of solid wood in the structure.
© Cyrille WeinerInnovations and technical specifications. Solar panels installed on the roof ensure a virtuous cycle of exploitation of natural resources. The floors of the balconies are made from the recovery of CLT window off-cuts. The facade coating was made with an ATEX (a French label for the creation of technical innovation) developed specifically for the project. The railings are made of Geolam composite wood resin, a durable and weather-resistant material.
Plan Lot C - 1st floorThe solid wood CLT structure is prefabricated in the factory, which halves the duration of the structural work, limits the number of truck rotations on site by 6 to 8 compared to concrete construction, and reduces the nuisance of the construction site for local residents.
French wood flooring with the PEFC label (certifying sustainable forest management) was chosen to reduce the building's carbon footprint
You'll now receive updates based on what you follow
Personalize your stream and start following your favorite authors
If you have done all of this and still can't find the email
The geothermal well will enable the French city's district heating network
to provide heating and hot water supply to 16,000 homes with more than 60% renewable energy
this heating solution is expected to reduce CO2 emissions by 22,801 tons each year
“SLB has the ambition to play a leading role in the energy transition by leveraging more than 90 years of expertise in advanced technologies associated with the exploration and production of energy,” said Olivier Peyret
SLB Chairman France & New Energy Europe Director
“Geothermal energy is a resource that has extraordinary advantages both in terms of its efficiency and its ability to reduce our impact on the environment
We are particularly proud to have contributed to this project
which demonstrates the importance of working within the framework of an ecosystem where everyone contributes their know-how for the benefit of a successful energy transition.”
“ENGIE Solutions has invested more than EUR 300 million in the sector in 10 years and carried out 20 low-energy geothermal drilling operations over the same period,” underlines Aurélie Lehericy
Deputy Managing Director of ENGIE Solutions Villes & Collectivités
“It is a source of pride for us to support the City of Vélizy-Villacoublay in this particularly exemplary project; the drilling results speak for themselves
we have mobilized all our know-how and our technological resources
serving both the future comfort of the Véliziens and the region's energy transition.”
The drilling project comprised a multilateral reservoir section with high dogleg severity (DLS) in the curves where the main wellbore branches off into three distinct boreholes
The individual borehole branches intersect the producing zones of the reservoir multiple times
thus improving the well’s overall productivity
The well profile design enhances the potential of geothermal fabrics containing water (known as aquifers)
promoting the recovery of water at 65 degC and providing a heat output of more than 16 MW
enabled this innovative geothermal well profile
effectively doubling the original production capacity by reaching up to 400 m3/h
The fit-for-basin AxeBlade bit contributed to delivery of the reservoir section ahead of schedule
For more information on SLB geothermal services, visit slb.com/geothermal
Improve penetration rates and downhole control with our ridged 3D cutting element bit
Drill complex curves and trajectories and sidetrack without making an extra trip
Dassault Systèmes (Euronext Paris: FR0014003TT8
DSY.PA) has announced the publication of the English version of its 2024 Universal Registration Document
which also serves as the Annual Financial Report
The document is now accessible on the company's investor relations website and physical copies can be requested at their headquarters in Vélizy-Villacoublay
DSY.PA) ha annunciato la pubblicazione della versione inglese del suo Documento Universale di Registrazione 2024
che funge anche da Rapporto Finanziario Annuale
Il documento è ora accessibile sul sito web delle relazioni con gli investitori dell'azienda e le copie fisiche possono essere richieste presso la loro sede a Vélizy-Villacoublay
Dassault Systèmes (Euronext París: FR0014003TT8
DSY.PA) ha anunciado la publicación de la versión en inglés de su Documento Universal de Registro 2024
que también sirve como Informe Financiero Anual
El documento ya está disponible en el sitio web de relaciones con los inversores de la empresa y se pueden solicitar copias físicas en su sede en Vélizy-Villacoublay
DSY.PA)는 2024년 보편 등록 문서의 영어 버전을 발표했다고 밝혔습니다
DSY.PA) a annoncé la publication de la version anglaise de son Document d'Enregistrement Universel 2024
qui sert également de Rapport Financier Annuel
Le document est désormais accessible sur le site web des relations investisseurs de l'entreprise et des copies physiques peuvent être demandées à leur siège à Vélizy-Villacoublay
DSY.PA) hat die Veröffentlichung der englischen Version seines Universellen Registrierungsdokuments 2024 bekannt gegeben
Das Dokument ist jetzt auf der Website der Investorenbeziehungen des Unternehmens zugänglich
und physische Kopien können in der Zentrale in Vélizy-Villacoublay
Publication of the English version of the 2024 Universal Registration Document
Hard copies of the 2024 Universal Registration Document in English are also available upon request at Dassault Systèmes’ headquarters (10
Dassault Systèmes Press ContactsCorporate / France Arnaud Malherbe: +33 1 61 62 87 73arnaud.malherbe@3ds.com
SIMULIA and SOLIDWORKS are commercial trademarks or registered trademarks of Dassault Systèmes
a European company (Societas Europaea) incorporated under French law
and registered with the Versailles trade and companies registry under number 322 306 440
or its subsidiaries in the United States and/or other countries
All other trademarks are owned by their respective owners
Use of any Dassault Systèmes or its subsidiaries trademarks is subject to their express written approval
Already have an account? Login
You don't have permission to access the page you requested
What is this page?The website you are visiting is protected.For security reasons this page cannot be displayed
Awaken your inner adventurer and get ready to plunge into the captivating world of Fort Boyard Aventures! Following the success of the Brétigny and Montpellier sites, France's third Fort Boyard Aventures will open its doors in the Vélizy 2 shopping center
Easily accessible by car or by taking the T6 tramway
this new gaming site promises to provide challenge and entertainment enthusiasts with an exceptional immersive experience
Fort Boyard Aventures Vélizy covers an area of 850m2
where players will find themselves right in the heart of the Fort's universe
You'll face a host of challenges on this playful course
which features five new cells unlike any of the other two centers
skill and balance to provide even more challenge and immersion
Whether you're in a team of 2 or 5 players (aged 7 and over)
Fort Boyard fans, this is the perfect address for you! Head for Velizy 2 to discover Fort Boyard Aventures, a great Action Game based on the famous France 2 TV game show! It's an experience we've already had at Brétigny
what more can we say about Fort Boyard Aventures in Velizy
or at least what makes it different from the Brétigny site
some of which are accessible to visitors (2 out of 5
We were of course able to test the new cells
a kind of casino roulette on which you have to throw balls
on which you have to throw a ball to hit a pin
the first requiring a little more skill than the second
which requires more strength (the bowling balls
are heavy and the range of action is limited)
and they're sure to be a hit (or at least we can't wait to try them out)
special mention should be made of the Cyclinders
very respectful of what the contestants do on the game show
Prepare yourself for an intense experience
keys and clues to be recovered will immerse you in a real adventure
are you ready to take up the challenge and pocket the prize
See you in Vélizy in September for the Fort Boyard Aventures adventure
This test was conducted as part of a professional invitation
Refer your establishment, click herePromote your event, click here
The leading authority for the Architecture & Design community
Recharge in a Restored Spanish Farmhouse in Menorca
The best part of movie theaters is usually when the lights go down. Not so for the new Cinéma UGC Vélizy 2 in Île-de-France’s north-central area Vélizy-Villacoublay. Thanks to Paris-based Atelier d’Architecture Lalo
the 143,000-square-foot complex is as much a draw as any superhero extravaganza
“I thought about a spaceship bringing us elsewhere
to the stars,” says founder Jean-Marc Lalo
I thought about the contrast between light and heavy elements.”
All that thinking resulted in a faceted ceiling of baffles between steel columns
angling into view above concrete balconies and benches that nod to classic cinema amphitheater seating in the 18 screening rooms
A monumental neon installation is another blockbuster touch
“The ceilings are exploded,” Lalo says
“with split white surfaces that receive color through spotlights
as if time were stopped.” Or as if the ceilings were silver screens themselves
Read more: Wuhan Panlong Plaza Yinxing Cinema by One Plus Partnership Wins 2018 Best of Year Award for Entertainment Project
on volumes that float in space and the possibility of ‘walking in the air,’ the UGC multiplex cinema in France
becomes the entrance of a new adjacent shopping mall
Owner: UGCMain Contractor: Unibail – Rodamco West FieldInterior design: Atelier Architecture LaloLighting: Ambiance LumiËre
Osvaldo MatosAcoustics: AABFurnishings: RBC MobilierBathrooms: BrouilletCeilings: D3AWalls: Filisa / Creative DigitalyFabrics: HTI Esprit & MatieresPhoto credits: Michel Denancè
open spaces and 18 theaters (for a total of 3800 seats) organized around a system of raised streets and connections
Designed by the Paris-based Atelier Architecture Lalo
this project confirms the architects’ interest in the creation of public spaces
based on the need to design ‘places of urbanity’ and the desire to share the present in evocative locations
Unibail-Rodamco-Westfield (the Franco-Dutch group active in the sector of real estate management
and a worldwide giant in shopping and retail real estate) and UGC have incorporated the new UGC Ciné-Cité in the project of revitalization of a shopping center and tramway
two dramatic escalators connecting the various levels
perspectives and suspended volumes in concrete that welcome the public on the way to the movie theaters
permitting gradual passage between the walkways and the cinemas
designed as belvederes or zones for events
with screens perfectly proportioned to the size of the rooms
lighted by ceiling fixtures that alternate with softer lateral lamps
similar to drops of water clinging to the walls
The multiplex stands out for its sober architectural choices
with ceilings that create interesting geometric effects thanks to triangular panels hung at different levels
The lighting combines spotlights with white beams that also mark the raised walkways
The box offices in wood are positioned below the staircases and the connections
to make room for the customers who can relax in the central foyer
where seats and tables alternate with wooden structures resembling small flights of steps
Architecture and cinema cross paths in this project that also offers spectators two works of art
The first is a video by the Spanish artist Hector Castells Matutano
appears suddenly on an enormous raw concrete wall
The Cat is a neon work by Claude Levêque that captivates and welcomes film buffs before they enter the theaters
The largest diffusion magazine in the luxury & design world
Privacy Policy(function (w,d) {var loader = function () {var s = d.createElement("script")
tag = d.getElementsByTagName("script")[0]; s.src="https://cdn.iubenda.com/iubenda.js"; tag.parentNode.insertBefore(s,tag);}; if(w.addEventListener){w.addEventListener("load"
false);}else if(w.attachEvent){w.attachEvent("onload"
loader);}else{w.onload = loader;}})(window
COMBINED GENERAL SHAREHOLDERS' MEETING
Dassault Systèmes (Euronext Paris: FR0014003TT8
DSY.PA) informs its shareholders that its Combined Shareholders' Meeting will be held on Thursday
2025 at 3:00 pm at Dassault Systèmes' headquarters
10 rue Marcel Dassault - 78140 Vélizy-Villacoublay
The convening notice stating the agenda will be published on May 2
2025 in the BALO and will be made available at the foregoing address
Documents and information relating to this meeting and especially information provided by the article R.22-10-23 of the French Commercial code
are available to the shareholders at the foregoing internet address
They will also be available at Dassault Systèmes' headquarters
Shareholders are invited to consult the Dassault Systèmes' 2024 Universal Registration Document
2025 with the Autorité des marchés financiers (AMF) and available on Dassault Systèmes' website at the forgoing internet address
It provides a major part of information mentioned in the article R.225-83 of the French Commercial code
Dassault Systèmes Investor Relations Team FTI Consulting
Béatrix Martinez : Arnaud de Cheffontaines: +33 1 47 03 69 48
+33 1 61 62 40 73 Jamie Ricketts : +44 20 3727 1600
[email protected]
[email protected]
Rome: Italian deputy prime minister Matteo Salvini fuelled tensions between the government and Stellantis Sunday
amid a row over automobile production costs and incentives in Italy
Salvini's far-right League party said it would demand answers in parliament about how much public money the world's fourth-largest carmaker has received and how many workers have been laid off
It followed claims by Stellantis CEO Carlos Tavares Friday that producing cars in Italy was too expensive due to energy costs
and that greater demand for electric vehicles would only come through bold incentives
Salvini's League said it was "launching Operation Truth" against Stellantis
It demanded to know "how much public money the group has collected over the years
how many Italian workers have been laid off or suspended
and how many factories have been opened abroad"
said Tavares "should be ashamed and apologise" for "mismanaging an historic Italian company"
Stellantis is the result of the merger in 2021 of France's Peugeot-Citroen and Italian-American company Fiat-Chrysler
Tensions have been mounting for several months between the government of Prime Minister Giorgia Meloni and Stellantis
with Rome accusing the multinational of relocating its production to low-cost countries to the detriment of Italian factories
The government in September decided to withdraw European Union funds intended for an electric car battery "gigafactory" over uncertainty over the time-table of the project from ACC -- a joint venture including Stellantis
Mercedes and French oil and gas giant TotalEnergies
Italy is still very attached to combustion engine cars and the automaker lobby is a powerful one
The industry is facing a 2035 EU deadline to phase out new sales of petrol-powered cars -- a ban Meloni's government