the 3rd German-Polish Balloon School Exchange “Mystery of the Wind” took place in Grudziądz
had the opportunity to learn about ballooning and the special importance of wind for flights.This exchange is supported by the German-Polish Youth Office through the STEM (Science
Engineering & Mathematics) funding program
Workshops and activities as part of language animation for team building are an important part of the program
The Balloon School Exchange takes place alternately at different locations in Poland and Germany
Thanks to the cooperation with the local balloon club
we had optimal conditions for our workshops and lessons in their great facilities
also for the balloon flights in the beautiful landscape of the Vistula around Grudziądz
We try to implement our workshops with simple means
and to establish a connection to ballooning
Everyone had a lot of fun in a competition in which the aim was to hit a target cross in the courtyard from the second floor
next year we hope to return to Bitterfeld-Wolfen
where we will have the opportunity to fly not only in a hot-air balloon but also in a gas balloon
Header image shows campers filling the balloon with cold air on the banks of the Vistula
FAI - Fédération Aéronautique Internationale
Design by Penceo - LAB
02 Mar 2025 13:30:00 GMT?.css-1txiau5-AnswerContainer{color:var(--GlobalColorScheme-Text-secondaryText2);}Rekord Bielsko-Biala vs Olimpia Grudziadz on Sun
Predicted lineups are available for the match a few days in advance while the actual lineup will be available about an hour ahead of the match
The current head to head record for the teams are Rekord Bielsko-Biala 1 win(s)
Have scored 3 goals in their last 5 matches
Who won between Rekord Bielsko-Biala and Olimpia Grudziadz on Sun
02 Mar 2025 13:30:00 GMT?Rekord Bielsko-Biala vs Olimpia Grudziadz on Sun
02 Mar 2025 13:30:00 GMT ended in a 1–1 tie.InsightsHave scored 7 goals in their last 5 matches
Rekord Bielsko-Biala is playing home against Olimpia Grudziadz on Sun
Speedway GP star Jason Doyle announced his Czestochowa return with 15 points
but it was not enough to deny his 2024 club Grudziadz a 51-39 win away to the Lions on Saturday
Three wins and three second places from six outings marked a fine PGE Ekstraliga return for Doyle
whose 2024 season was ended by a torn rotator cuff last May
But a 14-point tally from Danish racer Michael Jepsen Jensen inspired Grudziadz to victory
SGP star Max Fricke adding eight paid 10 and Jaimon Lidsey collecting eight paid nine
Doyle was supported by a 10 paid 12-point total from Polish rider Piotr Pawlicki
Pawlicki called on Czestochowa fans to stay behind the team
he wrote: “Today we had a really tough match
Although the result is not what we expected
let's remember that this is only the beginning of the season
This is the moment where we gather experience and learn from our mistakes.
“We're a tight-knit team that is not going to give up
Looking forward with hope and the confidence in our abilities
The weekend’s PGE Ekstraliga action continues with newly-promoted Rybnik hosting Gorzow and Torun welcoming Wroclaw on Sunday
For full details of the weekend’s PGE Ekstraliga results and scorers, click HERE
EKSTRALIGA | VACULIK LEADS GORZOW TO DERBY DELIGHT
ZMARZLIK LANDS MAXIMUM POINTS IN LANDSHUT AFTER SPEEDWAY GP & SPRINT DOUBLE
ZMARZLIK TAKES SPEEDWAY GP WORLD CHAMPIONSHIP LEAD AFTER WINNING LANDSHUT SPRINT RACE
The club from Grudziądz revealed the kevlar for the 2025 PGE Ekstraliga season
there have been significant changes in the color scheme
The Grudziądz club presented the suit for the 2025 season in an atmospheric video and in photos set against iconic city locations
the kevlar is dominated by black and blue colors
The entire design smoothly transitions from one color to the other
𝐊𝐄𝐕𝐋𝐀𝐑 #GKM2025 📸 pic.twitter.com/WDAQlx0xLW
supply and construction of the gas and steam power plant in Grudziądz – is already approaching 80 percent
One of the most important processes is currently underway at the main site of the power plant
namely the installation of the turbine unit
which will form the heart of the investment
the CCGT Grudziądz power plant under construction will be able to power up to 1 million households in the future
key parts of the power plant were transported to the construction site in Grudziądz
these are the main components of the turbine unit
The first two parts arrived to Grudziądz from factories in Germany
while the generator came from the United States
They were transported both by land and water – by sea and river
Assembly of the main machines began in May
when they were placed on their foundations
The works are expected to be completed with the start of the unit’s test commissioning
The gas turbine is the most important component that is the power plant’s drive source
Its operating principle makes it a device directly comparable to jet engines used in aviation
The task of the gas turbine is to convert the chemical energy of the fuel (natural gas) into mechanical energy (rotating shaft)
which will then be used to drive the generator
The product of the turbine’s operation (as a result of fuel combustion) is also the thermal energy of the combustion gases
when directed to the heat recovery steam generator (HRSG)
are used to generate steam at high pressure and temperature
High operating efficiency and the ability to respond quickly to changes in energy demand make gas turbines key components of today’s power systems
A steam turbine is a machine that allows you to convert the thermal energy of steam produced in a heat recovery steam generator (HRSG) into mechanical energy (rotating shaft) to drive the generator
the steam turbine will consist of two separate parts – bodies; these will be a common body of the high and medium-pressure parts of the turbine and a separate body of the low-pressure turbine
For a single-shaft turbine unit configuration
as is the case at the Grudziądz power plant
both gas and steam turbines will drive a common generator
Steam turbines are at the heart of power generation in many types of power plants
This conversion takes place in the condenser
a terminal device located at the outlet of the steam turbine
The steam turbine contributes to the efficient and stable generation of energy in the power plant
which – thanks to its location in the central part of the turbine unit – is driven from both sides by turbines
The generator converts the mechanical energy generated by the turbines into the power plant’s end product
Electrical power production in the generator occurs as a result of rotation of the generator rotor in a magnetic field
where energy is generated according to Faraday’s principle of electromagnetic induction
The rotor of the power plant’s generator in Grudziądz will rotate at an impressive 50 revolutions per second
This is due to its design and the frequency of the grid current
The generator of the Grudziądz power plant
thanks to synchronisation with the national power grid
will provide the ability to stabilise the key parameters of its operation (power
ensuring availability and safe supply of energy to end users.
The contract for the construction of the Grudziądz power plant was concluded with its general contractor (a consortium of Siemens Energy and Metlen Energy & Metals S.A
The cornerstone for the power plant was laid a year later
all the major foundations and structures necessary for the installation of the unit’s key equipment have been built in Grudziądz
The works carried out so far: the main components of the turbine unit have been placed on the foundations; the huge modules that make up the heat recovery steam generator have been assembled; the block transformer has been installed on the workstation; the pipelines have been built and the main part of the water fan cooler structure has been assembled
hundreds of workers continue the process of erecting more buildings
facilities and installations for further power plant equipment
Contractors working for the construction of the power plant are implementing gas
water and electrical power transmission systems
in cooperation with the Grudziądz Municipal Roads Authority and the road investment contractor
to begin works on redevelopment of public roads located in the vicinity of the power plant under construction
The importance of the investment in Grudziądz
The Grudziądz investment will be one of the largest and most modern power plants of its kind in Poland
contributing to Poland’s energy security and decarbonisation of the energy generation sector
Gas-steam power plants are characterised by high flexibility and the ability to quickly transition from shut-down to full capacity
These are critical features for an electric power system with rapidly growing renewable sources
such as due to unfavourable weather conditions for RES production
CCGT units can make up for the shortage by efficiently balancing electrical power production
both renewables and low-carbon gas-fired power plants are two key pillars of Energa’s development strategy until the end of 2030
7th Commercial Division of the National Court Register
share capital/paid-in capital PLN 4,521,612,884.88
Public Information Bulletin
powered by netPR.pl
Maksimum punktów dla Zmarzlika po wygranej w sprincie i rundzie SGP w Landshut
Bartosz Zmarzlik wygrywa sprint i prowadzi w klasyfikacji generalnej SGP
Dominik Kubera: Jestem gotowy na mój drugi sezon w SGP
May 19, 2022 | Business, Energy & Climate
Polish state energy firm Energa has signed an agreement with a German-Greek consortium to design and build a gas-steam power plant as part of efforts to move away from coal towards lower-emission sources of power
which will be built in the city of Grudziądz in collaboration with Germany’s Siemens and Greece’s Mytilineos
Construction is expected to start this year and be completed by 2025
at an estimated cost of 2 billion zloty (€430 million)
A gas-steam power plant produces up to 50% more electricity from the same fuel, as the waste heat from a gas turbine is later used in a steam turbine, which generates extra power. It is planned for the plant to later run entirely on hydrogen
Polish state oil giant plans nine low-emission “hydrogen hubs” in Poland, Czech Rep and Slovakia
“It will be one of the most modern facilities of its kind in Europe,” said Energa, which was in 2020 taken over by another state energy firm, Orlen
“It is an important step in the Orlen Group’s plan to expand into energy based on renewable sources
small nuclear reactors and low-emission gas generation.”
“The power plant in Grudziądz is certainly another important point in the direction of decarbonisation of the energy sector in Poland
which will significantly reduce CO2 emissions,” said Grzegorz Należyty
managing director of Siemens Energy Poland
“Siemens Energy technology will allow for co-firing a mixture of gas and hydrogen in the future
thus ensuring the security of electricity supply to the Polish energy system,” he added
That has included a growing role for renewables and plans for the country’s first nuclear power stations to open within the next decade
As Russia turns off the gas, Poland finds ways to keep supplies flowing
Main image credit: Energa (press materials)
Alicja Ptak is senior editor at Notes from Poland and a multimedia journalist
Business, News, Politics
Karol Nawrocki even suggested that the state security services were involved in creating the scandal
History, News, Society
The 1,200 square metre national symbol was unfurled on the beach in Międzyzdroje
News, Politics, Society
The proportion of Poles saying the US has a positive influence on the world has also fallen to its lowest recorded level
Apr 30, 2025 | Defence, Hot news, News, Politics
That response will include “large Polish and NATO exercises in Poland”
Apr 29, 2025 | Business, Hot news, News, Society
Those employed in Poland work on average the third-longest hours in the European Union
Apr 28, 2025 | Business, Energy & Climate, Hot news, News, Politics
Westinghouse and Bechtel were first chosen in 2022 as partners on the 192 billion zloty ($51 billion) project
please consider helping us to continue and expand it
[email protected]
Copyright © 2025 Notes From Poland | Design jurko studio | Code by 2sides.pl
Senior Research Fellow at the Global Europe Centre
ARTICLES BY THIS AUTHOR
Weronika Strzyżyńska is currently studying journalism at Goldsmiths as a Scott Trust Bursary recipient
She has written on issues immigration and Brexit for New Statesman and Prospect
Agnieszka Wądołowska is managing editor of Notes from Poland
She has previously worked for Gazeta.pl and Tokfm.pl and contributed to Gazeta Wyborcza
ARTICLES BY THIS AUTHOR
ARTICLES BY THIS AUTHOR
Daniel Tilles is editor-in-chief of Notes from Poland and assistant professor of history at the Pedagogical University of Krakow
He has written on Polish affairs for a wide range of publications
The Independent and Dziennik Gazeta Prawna
ARTICLES BY THIS AUTHOR
Stanley Bill is the founder and editor-at-large of Notes from Poland.He is also Senior Lecturer in Polish Studies and Director of the Polish Studies Programme at the University of Cambridge
Stanley has spent more than ten years living in Poland
He founded Notes from Poland in 2014 as a blog dedicated to personal impressions
cultural analysis and political commentary
He is committed to the promotion of deeper knowledge and understanding of Poland
He is the Chair of the Board of the Notes from Poland Foundation
ARTICLES BY THIS AUTHOR
ARTICLES BY THIS AUTHOR
Professor of European Studies at Oxford University
ARTICLES BY THIS AUTHOR
Professor at the Institute of History of the Jagiellonian University
ARTICLES BY THIS AUTHOR
Executive Director of Taube Family Foundation
ARTICLES BY THIS AUTHOR
Associate Professor at the Institute of Political Studies of the Polish Academy of Science
ARTICLES BY THIS AUTHOR
ARTICLES BY THIS AUTHOR
ARTICLES BY THIS AUTHOR
Robert Kościecha is about to start his second season as the coach of BAYERSYSTEM GKM Grudziądz
he talked about the preparations for the upcoming season and the form of his players
Marek Kania (ekstraliga.pl): Are you satisfied with the current progress of the preparations for the season
Robert Kościecha (coach of BAYERSYSTEM GKM Grudziądz): I think so
We initially planned to go on track on March 15 and managed to do it
but I’m glad the weather is cooperating
Did the training camp in Spain go as successfully as last year’s
but it was a decision we made after talking with the riders who have many other commitments during the preseason
I’m glad the club organized this trip despite the cost
and we will definitely repeat it in the future
📸 Z cyklu: "zdjęcie rodzinne". BAYERSYSTEM GKM Grudziądz 2025 🟡🔵 pic.twitter.com/q6jvJoDM71
BAYERSYSTEM GKM Grudziądz has scheduled friendly matches with KS Toruń and MOONFIN MALESA Ostrów Wielkopolski
Are you planning any additional preseason matches
If in conversations with the riders the boys express the desire for an extra practice match on our track or away
We are constantly in contact with several clubs to arrange such a meeting
In the first home match of the PGE Ekstraliga you will face the team of INNPRO ROW Rybnik
Do you think this rookie team is a good opponent for the season opener at the stadium on Hallera 4
Each of the eight PGE Ekstraliga teams is a strong team
Everyone prepares very solidly for the season
Even the smallest mistake during a match can cause problems later in the season
In several of last year’s home matches
BAYERSYSTEM GKM Grudziądz started poorly and had to make up significant deficits from the first series of starts
We had matches where our starts weren’t the best
The toughest situation was the match with STAL Gorzów
where after the first series we were already losing by 10 points
We’d like to control the score more often
as we did in the competition with BETARD SPARTA Wrocław in the regular season or with KRONO-PLAST WŁÓKNIARZ Częstochowa
and I hope we won’t make mistakes and will be a strong team from the very start
Michael Jepsen Jensen made a spectacular comeback to PGE Ekstraliga
Do you think the Dane can maintain such good performance this season as well
He is in great physical shape for the season
You can see he’s doing everything to achieve the best results
last season wasn’t particularly outstanding
Can the Australian improve his form from last year
Jaimon is certainly capable of much better results
A weaker end of last season affected his race point average
Jaimon knows what mistakes he made and will want to avoid them in the future
Was Jakub Miśkowiak the player your team missed last season
Kacper (Pludra – editor’s note) got opportunities whenever possible
Jakub Miśkowiak comes to us as an enhancement
By Metro Report International2022-05-17T05:00:00+01:00
POLAND: One of four trams which is Modertrans is to supply to Grudziądz has arrived in Łódź for dynamic testing and certification
The trams are being supplied under a 23·3m złoty contract awarded in March 2021
They are part of the Moderus Beta low-floor family
The first vehicle is expected to be delivered to the customer by the end of June
with the remaining three to follow by the end of September
POLAND: The first single-section Moderus Gamma LF 05 AC tram built by local supplier Modertrans entered service on Route 99 in Poznań on September 18
Operator MPK Poznań and Modertrans believe it is the first single-section
Miejski Zaklad Komunikacji Grudziadzu Sp zoo
POLAND: A consortium of Przedsiebiorstwo Budowy Dróg i Mostów and Tor-Kar-Sson has won a contract to modernise the metre-gauge tram network in Grudziadz
The 54·8m zloty contract covers 7·6 km of track and overhead electrification renewals
Site powered by Webvision Cloud
They gave him an injection and handed him a 20-złoty banknote – worth about 8 Swiss francs
He was just led to believe that it was an ordinary vaccine against seasonal flu
remembers the events of 2007 that took place in a clinic in the Polish town of Grudziadz
situated in the middle of nowhere between Warsaw and Danzig
Grzegorz was then a resident in a hostel for the homeless
and tempted by the idea of earning a little bit of money
If he had known that it was for a clinical trial
an experimental drug – the anti-flu treatment Aflunov (Fluad-H5N1) – was tested at Grudziadz on about 350 people
The series of trials V87P4 was intended to prove the efficacy of this pre-pandemic vaccine against the H5N1 virus
The illness was rampant in South-east Asia at the time
and represented enormous commercial potential for pharmaceutical companies
many governments wished to ensure adequate supplies of vaccine: this was a very profitable market
especially for the company that could obtain the authorisation to market a product that was effective again avian flu
It was therefore urgent to test the safety and efficacy of Aflunov
The research organisation mandated by Novartis to conduct the clinical trial in Poland was also aware of the urgency of the situation
the contracts were signed in haste in the clinic at Grudziadz
one of the 23 where the vaccine was tested in Poland
The medical team had required the nursing staff to find people willing to participate in the test as quickly as possible
members of their families and others they knew were vaccinated first
When it was no longer possible to find other people in their entourage
a well-known drug addict in the town was asked to recruit guinea-pigs in the Frère Albert homeless shelter
the nursing staff themselves signed the consent forms and
even took part of the fee that was due to be paid to those who participated in the trial
It was by chance that the police became aware of the situation
following an affray between the residents of the home concerning the amount received for their participation
which was significantly higher than normal
He does not know whether this was connected with the clinical trials
but he believes that it is possible that the administration of the vaccines could have had negative consequences for the residents
He therefore requested that the prosecution open an investigation
His request was denied on the grounds that a medical examination had proven that the vaccine was not harmful to health
The doctor responsible for the examination
the study in question was invalidated by the competent European authorities
The prosecution initiated proceedings against the doctors
for falsification of documents and undue enrichment
The public prosecutor considered that the sponsors of the study had suffered a loss
The surgery personnel had not respected the terms of the contract that linked them to Novartis and to its Polish sub-contractor
The latter even obtained a promise of compensation
The lawyers acting for the nursing staff are appealing
just before the deadline for the limitation period for this case
the Appeal Court at Danzig rendered its judgment: six nurses and three doctors were declared guilty of falsification of documents and undue enrichment
and were given fines and suspended prison sentences
The Polish tribunal attributed all the responsibility for this affair to the clinic personnel
the doctors and the nursing staff were subjected to severe pressure and
the related international directives stipulate that the sponsor of a clinical trial is responsible for its conduct
It is the responsibility of the sponsor to ensure that those people willing to take part in a clinical trial be adequately informed about its nature
and therefore able to give their informed consent
the Polish tribunal even awarded compensation to the company that represented Novartis
on the grounds that it had suffered a loss from the clinic
received nothing: no compensation for infringement of the individual’s rights; and no compensation for their resulting health problems
is claiming 50,000 Swiss francs in damages and interests from the Basel-based giant
and at least 50,000 Swiss francs representing the sharing of profits – Novartis having in the meantime sold its vaccines division for a high price
In order to delay the deadline for the limitation period
his Zurich-based lawyer has submitted a request for the prosecution of the group for an amount of five million Swiss francs
it is clear that the sponsor must also take responsibility for the behaviour of those persons who support it in conducting the test – in this case
the organisation commissioned to undertake the research
This principle is enshrined in law in both Poland and Switzerland
the decision could affect tens of thousands of people who are currently participating in clinical trials for Novartis around the world
It is essential that the pharma giant accept its responsibilities
and in future take all necessary measures to guarantee the protection of people who participate in drugs testing
Novartis refused an out-of-court settlement with Grzegorz S
during the attempt at conciliation that took place in July 2017 at a civil tribunal in Basel
Public Eye is not formally involved in the judicial part
CIA PMR & Officials Subcommittee member
The 2023/6th FAI Junior World Hot Air Balloon Championship (JWHABC) begins soon with details as follows
The first JWHABC was held in 2012 in Lithuania. This year will be the 6th edition
JWHABC has been hosted in Poland three times in a row- Wloclawek in 2014
GRUDZIĄDZ is strongly associated with aviation history
It is the place where the famous Polish Air Force Officer School was established in 1925. Later it moved to Dęblin
where training of the elite of military pilots is still conducted
and para gliders flying in the sky is a very common scene in Grudziądz
They care about these traditions and the sentiment it brings- because they think it's worth it
This will be the first big event for the city of Grudziądz. The director of the organization thinks this will be a big challenge for him and for his team
but they are confident of a successful outcome
Forty-five pilots from 17 countries will compete for the title of Junior World Hot Air Balloon Champion. The youngest participant is Tereza Stanova from Czech Republic
said that they have been doing trainings together since the beginning of this flying season
The more they participate in competitions together
They will compete in JWHABC helping each other
and they hope that one of them finishes on the podium
All persons on board in the basket must be aged less than 30 at the start of the event
The Gold medal winner shall automatically be invited to the next World Championship
The Junior World HABC is every two years. Pilots have only a small window of opportunity to participate in this event during their pilot career so it will be very prestigious to earn the gold medal
the Polish Aero Club Balloon Commission and the World Air Sports Federation (FAI)
The Strategic Partner of the event is the Kuyavian-Pomeranian Voivodeship
The event is also widely supported by the Senator of the Republic of Poland
The event director of JWHABC is Eugenijus Komas. Eugenijus started his career in ballooning 25 years ago as an Observer
a competition official assigned to each competitor
I asked him for a comment about JWHABC even though he was busy preparing for another event
When he went to Grudziądz for the first time 2 years ago
they showed him the facility for the competition head office of the Championship. But it was not the best in his opinion
a different place for the competition head office was used. It was not a good place in the hot weather. It turned out to be like an oven
The organizer found another place for this year. Eugenijus thinks it will be an ideal place for this kind of event
Eugenijus said that the most important things right now are the weather and the task settings
He really hopes that everything is going to work perfectly as he has been planning
but he also said that the devil is hiding in the details
Let’s hope that we will not see the devil during the Championship
Luckily in the FAI Ballooning Public & Media Relations (PMR) Sub-Committee
we have former gold medalist of the Junior Worlds
To take a part at an event like the Junior Worlds
the organizers opened the event with a public ceremony in Wloclawek and we got to really feel what it is like to represent a nation
mingle in between the teams and together create an atmosphere you can hardly feel at any other event
At least these are my memories from both junior world events I took part at
would be to enjoy the event one with another
You are there to meet pilots and crew from all around the world
As the community worldwide is still rather small
those people will be around for a long time
As always - try rather scoring alright on all tasks
Ballooning is highly about relativity to the rest of the pilots
Keep that in mind before fighting hard for an off-grid target
I am really looking forward to the updates from JWHABC at Watchmefly
FAIBallooning channels and the various social medias that organizers is offering
I am sure you will find the best moments from the event
“Balloons bring good luck” is the motto of this event
The organizer wants to let people know that ballooning is for everyone
the organizer planned some events where people can come closer to flying balloons or even go into the basket in tethered balloons
videos from the ground and from the drones during the event
When possible, there will be live streaming on the FAI Ballooning Facebook page as well. So please do not forget to follow FAI Ballooning Facebook page
If you are at the site and want to share your experience on social media
Danish racer Leon Madsen revived his Speedway European Championship fortunes with victory at round two in Grudziadz on Saturday
Madsen defied a last place in his opening ride at the Polish venue to qualify for the last-chance race on 11 points
he then won the final ahead of Polish duo Kacper Woryna and Piotr Pawlicki to top the podium
with Aussie wild card Max Fricke placed fourth on his PGE Ekstraliga home track
Woryna and Pawlicki topped the heat score chart on 13 points to qualify for the final automatically
Fricke earned his final place by finishing second to Madsen in the last-chance race
With Czestochowa racer Woryna taking second spot in the final
he is now joint top of the championship on 24 points – tied with Latvia’s Andzejs Lebedevs
Third place in the final saw Pawlicki finish the night with 14 points and he moves up to third in the standings on 23 – one behind Lebedevs and Woryna
Reigning champion Mikkel Michelsen suffered a setback in his bid for SEC title No.4 after exiting in the last-chance race
Two-time European champion Madsen’s victory leaves him fifth in the SEC standings on 19 – level on points with former world No.3 Maciej Janowski
With the SEC champion guaranteed a spot in the 2025 FIM Speedway Grand Prix series and just five points separating the top six riders
the European title fight is set to be intense over the final two rounds at German track Gustrow on August 24 and Chorzow’s iconic Silesian Stadium in Poland on September 21
SPEEDWAY EUROPEAN CHAMPIONSHIP STANDINGS (AFTER 2/4 ROUNDS):
Max Fricke is approaching his third season with BAYERSYSTEM GKM Grudziądz
The Australian talks with ekstraliga.pl about the competition in the PGE Ekstraliga and his participation in the Speedway Grand Prix series
Max Fricke has already completed his initial training sessions on the Grudziądz track
The BAYERSYSTEM GKM rider is pleased that nothing is disrupting his preparations for the season
– At the moment everything is going according to plan
there are more and more outings on the track
there will be a lot of training to prepare as best as possible for the first PGE Ekstraliga match – the Australian says in an interview for ekstraliga.pl
Many riders experiment during the preparation period by making changes to their individual training
having trained in the same way for several years
– I prepared just like before every season
without introducing anything extraordinary
but we generally stick to proven solutions – he highlights
©️APTAIN Max 🟡🔵 pic.twitter.com/ndEgNWbPmp
Max Fricke was announced as the captain of BAYERSYSTEM GKM Grudziądz
The upcoming season will be the Australian’s third wearing the yellow and blue colors
I have great support from the fans and the club’s management
The previous two years in Grudziądz have been successful for me
I am glad that I will spend another season with this team
and I hope it will be just as good a year – emphasized the 2016 Junior World Champion
the BAYERSYSTEM GKM Grudziądz team is capable of fighting for medals
– Everyone wants to advance to the playoff phase
We are aware that it won’t be easy because there are many strong teams in the PGE Ekstraliga
the top four of the league is within our reach – stated the captain of the Grudziądz team
Max Fricke participated in 8 rounds of the Speedway Grand Prix series as a reserve replacing the injured Jason Doyle
he will be a regular participant in the competition for the Individual World Championship title
– This will be another busy season for me
Apart from riding in the PGE Ekstraliga and the English league
I have the Speedway Grand Prix starts ahead of me
I want to make the most of my opportunity and shine in this series – summed up the Australian
Poland’s former world No.2 Patryk Dudek led the charge as the hosts cruised to FIM European Team Speedway Championship gold in Grudziadz on Saturday
In FIM Europe’s version of the FIM Speedway World Cup four-team competition
Poland took a commanding victory with 51 points
dropping just one point from his five rides
while four-time Speedway GP world champion Bartosz Zmarzlik raced to 13 – a total matched by former SGP winner Piotr Pawlicki
His brother Przemyslaw Pawlicki tallied 10
while reserve Wiktor Przyjemski scored one
Former Speedway GP winner Anders Thomsen impressed for silver medallists Denmark on 14 points from six races
with European individual champion Mikkel Michelsen notching nine
Rasmus Jensen scoring seven and Mads Hansen collecting five
World No.2 Fredrik Lindgren was Sweden’s star man on 10
with former Speedway GP duo Antonio Lindback and Kim Nilsson scoring four each
Czech Republic’s Speedway GP newcomer Jan Kvech led their scorechart on five along with Vaclav Milik
Daniel Klima collected two points and Adam Bednar one
Aussie ace Max Fricke raced to 14 points for Grudziadz as they defied the absence of Jason Doyle to claim a vital 47-42 victory at home to local rivals Torun in the PGE Ekstraliga on Sunday
Fricke went unbeaten in his final three rides of six to lead his side to victory
with Vadim Tarasenko also impressing on 11 paid 14 as the club operated rider replacement for Doyle
who suffered rib and shoulder injuries in a Rowe Motor Oil Premiership match for Ipswich at King’s Lynn on Thursday
Former world No.3 Emil Sayfutdinov raced to 11 points for Torun
with Great Britain racer Robert Lambert notching nine and Patryk Dudek collecting seven paid eight
former Speedway GP world champion Artem Laguta racked up a 15-point maximum for Wroclaw as they cruised to a comfortable 56-34 win at home to Wroclaw
Laguta was well supported by a 10 paid 12-point haul from 2023 SGP2 bronze medallist Bartlomiej Kowalski
with GB racer Dan Bewley adding eight paid 11
Maciej Janowski picked up eight paid 10 and Tai Woffinden scored six
Slovak star Martin Vaculik led Gorzow’s score chart on 12 paid 13
with his Speedway GP rival Szymon Wozniak scoring two paid three
There will be more PGE Ekstraliga action on Tuesday as Gorzow hosts Grudziadz and Czestochowa welcomes Torun
For full details of the weekend’s PGE Ekstraliga results, scorers and the latest league table, CLICK HERE (website in Polish)
Former Speedway GP world champion Jason Doyle will spearhead Grudziadz’s PGE Ekstraliga play-off challenge in 2024
The 2023 FIM GP Challenge winner makes the move from relegated Krosno
where he joins forces with SGP first reserve Max Fricke
There will be another Aussie in the line-up as 2020 FIM Speedway Under-21 world champion Jaimon Lidsey completes a switch from Leszno
Doyle and Lidsey’s arrival at the club was announced with a fun video
which appeared to show both riders skydiving into the stadium
with his old Leszno teammate Lidsey’s emerging from the Grudziadz mascot’s suit to JD’s surprise
They are joined in the team by Russian-born Polish-licensed rider Vadim Tarasenko and Polish young gun Kacper Pludra
Jan Przanowski and Kacper Wardulinski also in the squad
Aussie racer Max Fricke scored 14 points for Grudziadz
but it was not enough to see them into the PGE Ekstraliga play-offs as they were held 45-45 away to Czestochowa on Friday
Grudziadz needed to win to have any chance of knocking sixth-placed Leszno out of the play-off spots
coupled with nine from triple world champion Nicki Pedersen and eight paid nine from Gleb Chugunov couldn’t take them through to the title-deciding matches
Double World Under-21 champion Maksym Drabik led the scoring for the Lions
with world No.2 Leon Madsen notching nine paid 11 and Speedway GP star Mikkel Michelsen and Jakub Miskowiak scoring seven points
The day’s other match also ended in a draw as Robert Lambert and Patryk Dudek both tallied 10 points for fifth-placed Torun as they drew 45-45 away to Gorzow in third
Former world No.3 Emil Sayfutdinov topped the Torun score chart on 10 paid 11
Slovak star Martin Vaculik also scored 10 for Gorzow
with Szymon Wozniak notching nine and Oskar Fajfer
Oskar Paluch and Anders Thomsen each contributing seven to their side’s total
The final two matches of the regular PGE Ekstraliga season take place on Sunday
with table-topping Wroclaw welcoming second-placed Lublin and already-relegated Krosno hosting Leszno
For full details of the day’s results, scorers and the latest league table, click here: https://speedwayekstraliga.pl/en/
The city of Grudziądz in northernd Poland has signed a contract for the delivery of seven Volvo 7900 Electric Hybrid buses (plugin hybrids)
Charging stations will be delivered by Heliox
The buses are equipped with a 5 litres diesel engine and a 150 kW electric motor
Inowroclaw ordered eight electric hybrids and eight fully electric buses from the Swedish manufacturer
Volvo has now sold 112 electrified buses in Poland
Hybrid buses are not a common choice around Europe
in Europe the choice of full electric buses appears to be dominant (74% of the current electric fleet of 2,100 vehicles)
The buses will be fast charged at the end stops via pantograph
will be based on the common interface OppCharge
whereby the charging stations can also be used by electrified buses from other vehicle manufacturers too
The electric motor I-Sam of Volvo 7900 Electric Hybrid provides a maximum output of 150 kW (1,200 Nm is the peak torque)
An average electric bus can cover around 10 km with this amount of electricity
Energy consumption for Volvo’s electric hybrid buses is about 60 percent lower than for corresponding diesel buses
Emission of carbon dioxide is reduced by 75 to 90 percent
The electric hybrid can run in electric mode for about 70% of the route
The Volvo 7900 Electric Hybrid can run as an electric bus in selected areas
5,1 litres) offers extended range in line-operation
The buses will be delivered to Grudziadz in the spring of 2019
Manufacturing will take place in Volvo’s factory in Wrocław
The electric hybrid buses are being sold as a turnkey package whereby Volvo takes care of all vehicle and battery maintenance
“This solution allows for a completely different perspective of the city planning
exhaust-free zones since the electric hybrid has the ability to drive fully electrically in such zones
shopping malls and hospitals,” says Małgorzata Durda
Volvo hybrid buses have previously been delivered to the cities of Wrocław
and recently the company won tenders for the delivery of hybrid buses to Kraków
Volvo delivered 35 hybrids to Sosnowiec; to date the largest fleet of hybrid buses in Poland
© Copyright 2012 - 2025 | Vado e Torno Edizioni | All rights reserved | P.I
Looking to access paid articles across multiple policy topics
Interested in policy insights for EU professional organisations
LGBT rights groups and the opposition have slammed the leader of the ruling Law and Justice (PiS) party Jarosław Kaczyński for his statements about transgender people at a party rally
During the weekend’s public meetings in Grudziądz and Włocławek in…
During the weekend’s public meetings in Grudziądz and Włocławek in Central Poland
Kaczyński devoted part of his speeches to transgender people
He said transgender identity is absurd from the point of view of traditional values and common sense
Another important part of the Grudziądz power plant project has arrived at the construction site
which is the most important element that forms the heart of this project
A project that is important for the National Power System
but also for the residents of the Kuyavian-Pomeranian region
Owned by the company Energa from the ORLEN Group
the Grudziądz power plant will be able to power up to 1 million households in the future
making a visible contribution to Poland’s energy security as well as the transformation of Poland’s electricity generation sector
The construction is scheduled for completion next year
and the current state of advancement of works exceeded 70 percent in March
The investment project is implemented by CCGT Grudziądz
a company that belongs to Energa from the ORLEN Group
consortium of SIMENS ENERGY and MYTILINEOS Energy & Metals
Siemens Energy is a company located in 90 countries
they are operating across the whole energy landscape
from grid technology to storage to electrifying complex industrial processes
At the same time MYTILINEOS is a multinational industrial and energy company
which solidified its reputation through successful execution of thermal energy projects across Europe
thanks to combination of experience both consortium partners
they are combining their expertise with CCGT Grudziądz for Project success
which is one of the most technically advanced machines of its kind in the world
was manufactured at Siemens Energy’s factory in Berlin
to complete the final leg of its journey to Grudziądz again on a barge
Since this transport was unique in its size – taking into account the infrastructure available in Grudziądz – it was necessary to prepare a special wharf for its needs
It took three days to transport the gas turbine from Gdańsk to Grudziądz
which was accompanied by two tugboats tasked with propelling it safely and efficiently
was at the time traversing the strong current of the river with its huge cargo
the speed at which the barge moved to its destination fluctuated between 8 and 12 kilometers per hour.
it set off for the final stage of its journey
straight to the construction site of the power plant
This unprecedented event in the history of Grudziądz took place on the night of March 26-27
arousing the interest of residents who accompanied the turbine on its passage through the city
The transport of the turbine on the final leg of its journey was carried out using a highly specialised 10-axle
80-wheel platform designed for transporting huge cargoes of this type
Powered by a special diesel-hydraulic drive
this vehicle was radio-controlled by an operator marching right alongside the machine
Due to the need to ensure precise control of such a massive set
the speed of the vehicle was approximately 5 kilometers per hour
The transport of the gas turbine through Grudziądz itself required detailed coordination and cooperation with the city authorities and municipal companies
including in particular the Municipal Roads Administration and the Grudziądz Municipal Transportation Department
In order to move such a huge cargo in the streets
it was necessary to: exclude part of the roads from use
change the organisation and route of part of the public transport
temporarily dismantle road signs that collided with the cargo
as well as raise the tramway overhead power supply located on the route of the turbine
Thanks to the smooth execution of the preparatory works
as well as the implementation of the transport during the night
this very complicated logistical operation was carried out safely
without generating undue inconvenience for residents
Gas turbine as a key component of the power plant
The gas turbine is a key component of the combined cycle power plant under construction in Grudziądz
Its task is to convert the chemical energy of the fuel (natural gas) into mechanical energy (rotating shaft)
which will then be used to drive a generator that will produce the final product of the power plant – electricity
to convey the scale of the enormous power of the gas turbine that has been delivered to Grudziądz
it is worth using some symbolic comparison
One of the world’s largest passenger airliners
the Boeing 747 (also colloquially known as the Jumbo Jet) can reach a power output (from thrust units) of 230,000 horsepower
which is produced by four huge turbojet engines
If such an aircraft were to provide the CCGT Grudziądz power plant with power comparable to that achieved by the SGT5-4000F gas turbine manufactured by Siemens Energy
two huge Jumbo Jets would be needed on the site
This comparison shows the enormous power of the machine that in recent days has been transported through the streets of Grudziądz to the power plant under construction on Skowronkowa Street
The third key component of the turbine unit is on its way
The site of the power plant under construction in Grudziądz already has both turbines – the steam turbine and the gas turbine delivered in recent days
In order to complete the delivery of all the most important components of the turbine unit under construction at the power plant
it is still necessary to deliver the generator
which is currently transported from the Siemens Energy’s plant in Charlotte (USA)
the machine with a weight of approximately 400 tons
will begin its journey down the Vistula River to Grudziądz
2024 – a year full of important activities
The work on the construction of the power plant is proceeding as planned
the cornerstone was laid for the power plant’s foundation
The foundation and structures necessary for the erection of the unit’s key equipment have been built
including in particular: the currently delivered turbine unit and the heat recovery steam generator that is already on site
whose huge modules were delivered last year to Grudziądz from the port of Gdansk
and facilities for the subsequent elements of the power plant equipment has begun
the power plant is undergoing the construction of buildings for
the control room and the administration building
systems are being built that will transfer cooling water
gas and electricity between the individual facilities of the power plant
works related to the construction of transmission pipelines that will deliver water from the Vistula River to the power plant
as well as the construction of a gas pipeline that will deliver fuel to the power plant
the construction of an overhead power output line from the power plant will begin
through which 400,000 volts of electricity will flow directly into the National Power System
The power unit in Grudziądz is one of the key investments of the ORLEN Group’s Energa in low-emission energy sources balancing the National Power System
The investment in the gas-steam unit in Grudziądz will support the strategic goals of the energy transformation of both Poland and the ORLEN Group itself
the Group aims to reduce carbon dioxide emissions by 40% per MWh (megawatt hour) by 2030 and to achieve full carbon neutrality by 2050
The Grudziądz power plant is also a production source that is important from the point of view of the Polish Transmission System Operator - Polskie Sieci Elektroenergetyczne (abbreviated PSE)
CCGT Grudziądz entered into a 17-year contract with PSE within the power market
with the first year of providing power falling in 2026
Four-time Speedway GP world champion Bartosz Zmarzlik raced to a 14 paid 15-point maximum as Lublin launched their PGE Ekstraliga title defence with a 52-38 win away to Grudziadz on Sunday
Zmarzlik delivered a perfect performance as he kicks off 2024 in red-hot form
with Speedway GP newcomer Dominik Kubera also impressing on 11 paid 12 as he gets ready for his full-time SGP debut in the FIM Speedway GP of Croatia in Donji Kraljevec on April 27.
World No.2 Fredrik Lindgren scored seven paid eight and Jack Holder added six paid eight in a solid team display from the visitors
Speedway GP first reserve Max Fricke was Grudziadz’s leading scorer on 12
with 2017 Speedway GP world champion Jason Doyle notching nine paid 10 and Jaimon Lidsey adding a straight nine
world No.3 Martin Vaculik topped the Gorzow score chart on 10 points as they defied a 14-point haul from Torun’s Robert Lambert to win 51-39 at Edward Jancarz Stadium
Vaculik was well supported by nine paid 10 from Oskar Fajfer
nine from Speedway GP newcomer Szymon Wozniak and eight paid 12 from former World Under-21 champion Jakub Miskowiak on his club debut
Young gun Oskar Paluch also starred on seven paid eight
Lambert piled up his 14 points from six rides
with former world No.3 Emil Sayfutdinov adding 12 and Patryk Dudek tallying 10
For the weekend’s results and scorers in full, please CLICK HERE to visit the PGE Ekstraliga’s official website (link in Polish)
Torun heroes Patryk Dudek and Robert Lambert piled up 32 points between them as they fired their side into the PGE Ekstraliga play-off semi-finals
Despite losing 51-39 away to Gorzow on Sunday and suffering a 99-81 aggregate loss
Torun claimed the lucky loser spot for the last four
DeWalt FIM Speedway GP of Poland – Wroclaw wild card Dudek starred on 17 and Lambert racked up 15 just 24 hours after finishing third at the Olympic Stadium
Torun matched Grudziadz’s 99-81 margin of defeat in their quarter final against Wroclaw
But having been placed fourth in the pre-play-off table with Grudziadz fifth
Danish champion Anders Thomsen led Gorzow through to the semis on 13 paid 14 points
with young gun Oskar Paluch adding 11 paid 13
DeWalt FIM Wroclaw Speedway GP winner Martin Vaculik notched nine paid 10 and Szymon Wozniak added eight
The first legs take place on either Friday or Sunday next weekend – either side of the OlyBet FIM Speedway GP of Latvia – Riga on Saturday night
Lublin cruised into the semis with an emphatic 58-32 win at home to Zielona Gora
which sealed a commanding 112-67 aggregate victory
Four-time Speedway GP world champion Bartosz Zmarzlik collected 13 points for Lublin
with Wroclaw runner-up Fredrik Lindgren accruing 11 paid 12
SGP2 champion Mateusz Cierniak added 10 paid 13 and Speedway GP rider Dominik Kubera scored 10 paid 11
while Jack Holder registered six paid eight
Former Speedway GP rider Przemyslaw Pawlicki was Falubaz’s top performer on 12 points
with his brother Piotr and Rasmus Jensen adding eight each
Former Speedway GP world champion Artem Laguta led the charge on 13 points as Wroclaw blazed to a 49-41 win away to Grudziadz to win their quarter final tie 99-81 on aggregate
Laguta was well supported by an 11 paid 13-point tally from Dan Bewley
while Maciej Janowski notched nine paid 10 and Bartlomiej Kowalski picked up seven paid 10
In-form Danish racer Michael Jepsen Jensen impressed on 12 paid 14 for Grudziadz
For full details of the results and scorers, CLICK HERE (page in Polish).
Triple world champion Nicki Pedersen has pledged to race on into 2024
despite losing his team places with Holsted and Grudziadz
The 46-year-old suffered what many feared could be career-ending hip and pelvis injuries in Grudziadz on June 5
Pedersen defied his doubters to get back on track and continued racing at the highest level – at the same time as taking over as Danish national team manager this summer
leading them to the bronze medal at the Monster Energy FIM Speedway World Cup Final in Wroclaw on July 29
Pedersen was stunned when his Danish Superligaen club Holsted
with PGE Ekstraliga side Grudziadz also not offering terms
But Pedersen has no plans to hang up his kevlars and posting a statement on social media
He said: “The 2023 season has come to an end – a season I will never forget
I fought my way back to do what no-one thought was possible after the worst injury of my career
I started the season well and scored maximum points in my first league meeting in Poland.
which made it difficult to hold on to the bike and gave me some difficult races.
despite my pain and small challenges I have had since my injury.
“This season was the end with both my Polish club Grudziadz and very surprisingly my Danish club Holsted
I always give everything I can – 100 percent
“Having to leave Holsted after 21 seasons has been difficult
I am not done yet and am currently negotiating with clubs in Poland
Whether I will ride in Denmark is not yet known
but if the opportunity and the match are correct
He added: “I would like to thank all my sponsors who have followed me in Holsted
I am sorry that I was not allowed to ride my last years and end my career in Holsted
“Let's see if we might not still see each other on the Danish speedway tracks in 2024
I'm not that easy to knock out; I fight to the end!”
Pedersen is already training ahead of the 2024 season to ensure he returns in the best shape possible
He said: “This year I want to start in October to train physically and get ready and fit for 2024
as my body needs more time to get back into fighting shape.”
Pedersen is pleased he took the plunge and accepted the chance to manage his country
He added: “I was very doubtful at the beginning if the time was right for me
and it turned out to be the right thing.
It makes me happy when I can share my experience and I can see that they can use it and take my advice to heart
It gives me something positive to be able to give something back to the sport and help the young people.”
selected the general contractor for a CCGT unit with a net power output of approx
Activities are to commence already this year
will be one of the most advanced facilities of its kind in Europe
It will be an important part of the expansion of the ORLEN Group’s energy segment based on renewable energy sources
small nuclear reactors and low-carbon gas-fired power generation
“The ORLEN Group is building a modern and low-carbon energy segment that will increase Poland’s independence and security
combined with growing production from ORLEN Group’s own sources
is a guarantee of stable and economical production
complementing the portfolio of renewable energy sources being developed at the ORLEN Group”
President of the PKN ORLEN Management Board
temporarily acting as President of the Energa Management Board
In light of the challenging situation faced by the entire power industry
which is attributable to the EU climate policy
the current technology landscape as well as some other factors
gas sources are expected to act as a stabiliser for the Polish electricity system
they can be used to balance out renewable energy sources
whose output depends on weather conditions
in view of the transition of the Polish energy sector
we should expect a continuing increase in installed renewable energy capacity
where output depends on hydrological conditions
in order to balance the variable output from renewable sources with existing demand
for the sake of safe operation of the National Electricity System
to ensure low-carbon generation assets enabling output control
such as the planned CCGT plant in Grudziądz”
President of the Management Board of CCGT Grudziądz Sp
The CCGT unit in Grudziądz will play an important role in ensuring the energy security of Poland
a 17-year capacity market contract was signed with the Transmission Network Operator
it will earn PLN 3.52 billion in revenue as a minimum
The investment project will be implemented by a consortium of Siemens Energy Global GmbH & Co KG
The technology to be used in the construction of the unit in Grudziądz will be one of the most advanced solutions available on the market
The planned CCGT unit will be characterised by high efficiency
more than 60 percent under nominal conditions
high availability and flexibility of operation
“We are excited to cooperate with the ORLEN Group for the second time in the construction of a power plant and delivery of a highly-efficient CCGT unit
The power plant in Grudziądz definitely marks an important milestone in the decarbonisation of the energy sector in Poland and will result in a considerable reduction of CO2 emissions
The technology delivered by Siemens Energy will enable co-firing of a gas and hydrogen mixture
which will ensure the security of supply for the Polish electricity system”
Vice President for Eastern Europe and Managing Director at Siemens Energy Polska
The construction of the CCGT unit is also important for the community
Large investment projects like this one are a key economic driver
creating new jobs and tax inflows to the local budget
“This is definitely going to be the largest investment project in Grudziądz
It offers our town an opportunity for continued strong growth
It will certainly mean high inflows to the budget from property taxes
estimated at more than ten million zlotys per month
But this is also a chance for local companies that may take part in the project as subcontractors
and later on dozens of high-skilled jobs will be created
a new road layout is also planned in connection with this project”
Log in and download the free e-publication of the latest A&B
The printed version is available for sale online in our store and press salons throughout Poland
unique e-mail [will also be used as login in the portal]
Only name - check the correctness of the data
Only the last name - check the correctness of the data
password must be at least 8 characters long
* fields required for registration; data can be completed in account settings after logging in
** establishment of a student account follows verification of the validity of the student ID card
Please try later or let us know: contact
Technology: aitnet.pl Ⓒ AiB Publishing House 2025
Triple world champion Nicki Pedersen insists Polish club Grudziadz didn’t force him to step down from the Peterborough side following his crash at the East of England Showground on March 27
The Danish team manager was racing in Britain for the first time since 2011 on what was his competitive racing comeback from the badly broken hip and pelvis he suffered in Grudziadz on June 5
But his SGB Premiership return against Ipswich lasted less than half a lap after he caught a soft patch in the first corner and crashed hard just beyond the second-bend air fence
He has also had fluid drained from his pelvis twice since the incident
scoring an 18-point maximum in Grudziadz’s PGE Ekstraliga opener at home to Czestochowa last Saturday
But rumours quickly circulated that the Odense-born star wouldn’t be returning to the UK
Despite claims that he was forced to step down by Grudziadz
Pedersen says departing Peterborough was his call to make
He said: “Of course I had a talk with them and said
‘what do you think?’ They said straight away ‘we don’t want you to make any more problems
and we can’t afford to lose you.’ But they never said a word to the effect of ‘you are not allowed to do this or that.’
I also can’t afford to miss one or two meetings in the Polish Ekstraliga because that is mostly where I earn my money
“I have always been an honest guy – to the fans and to everyone
The other riders could easily blame the Polish club
Pedersen was keen to ensure he doesn’t put himself at risk of further injury or take on too many meetings after a crash that could have ended his career just over 10 months ago
The 46-year-old said: “The back is still very
I know I scored a maximum in Poland the other day
but I was absolutely exhausted for three days afterwards
That means I cannot continue to do two or three meetings a week – the body is just not well enough for that yet
“I took the decision I had to pull out because I don’t want to do things that I know I cannot do 100 percent
people really expect me to do them 110 percent and I wanted to do this at 110 percent
“But it’s not possible right now with the injuries I came with from the past and the new one I took on board with the back
and it isn’t possible to do things by halves
That would be dangerous to myself and the other guys.”
Some have questioned how much money Pedersen earned from his very brief return to Peterborough
but the Dane insists he didn’t take a penny from the club
He said: “I saw people saying they hope I send my money back for the signing-on fee
Pedersen admits track conditions on the night at the East of England Showground made life tricky
But he insists he doesn’t leave the SGB Premiership with any bad feelings towards Britain or its fans
He said: “I love British speedway and the country
But the tracks are different with the shale and the way they prepare the tracks compared to the other countries
“The preparation at the venue and stuff like that was not ideal on the night
We could hardly practice on the track in the afternoon
Then they worked hard on the track to try and get it prepared for the evening
Three riders hit that soft bit on the first and second corner
It is quite normal that you take the inside line for the first few heats
We all hit it and tried to avoid each other
and fortunately I ended up going into the fence instead of any other riders
they moved the white line one and a half metres out
which they probably should have done before
the meeting should probably not have been on.”
This website is using a security service to protect itself from online attacks
The action you just performed triggered the security solution
There are several actions that could trigger this block including submitting a certain word or phrase
You can email the site owner to let them know you were blocked
Please include what you were doing when this page came up and the Cloudflare Ray ID found at the bottom of this page
CA Immo exits non-core market Serbia with the sale of the 19,600 sqm office building Sava Business Center in Belgrade
Both the sales price and the buyer are subject to confidentiality
As the PBSA sector finally takes off in Poland
it is now increasingly attracting international operators and investors
Eurobuild CEE spoke to Xior's investment manager
about why it has such confidence in the Polish market
Residential developer Develia has signed a preliminary agreement to acquire all the shares in Bouygues Immobilier Polska
the Polish subsidiary of Bouygues Immobilier
ESA logistika has leased 15,000 sqm in Prologis Park Piotrków
GLP has completed the development of its Wrocław V Logistics Centre and has received a BREEAM rating of Outstanding
Panattoni has secured EUR 40 mln in financing from BNP Paribas for the development of Panattoni Park Sosnowiec IV
Newgate Investment (NGI) and Redkom Development are developing a large retail park in Bydgoszcz
Deutsche Hypo – NORD/LB Real Estate Finance has provided a five-year green loan to Olivia Seven for the refinancing of the Olivia Prime A office building in Gdańsk-Oliwa
communications and security company Motorola Solutions has signed a five-year lease renewal
18,000 sqm at the Green Office complex in Kraków’s Podgórze district
Falling interest rates and easing monetary policy across the eurozone and CEEi are boosting investor confidence in the region’s commercial real estate market
reveals Colliers in its ‘Beyond Real Estate | Economy’ report
Panattoni is to build the Panattoni Park Mainz Süd in Erbes-Büdesheim bei Alzey
Axi Immo has presented its latest report “Warsaw Office Market – Q1 2025
The market opened in 2025 on a steady footing
with a notable increase in leasing activity and a modest decline in vacancy
landlords continue to focus on upgrading existing assets and prioritizing quality over quantity
Convenience store chain Żabka has officially opened a new logistics centre in Kąty Wrocławskie
The first stage of the development will serve 1,500 stores in the Wrocław area
Romanian Post has leased over 5,000 sqm of logistics space in CTPark Bucharest to serve as its temporary regional courier and logistics hub for Bucharest
JLL has announced the sale and leaseback of two properties by a manufacturing company in a deal worth over PLN 1 bln
Warehouse developer CTP is adding 2,000 sqm to its Clubco coworking development in Brno
pbb Deutsche Pfandbriefbank has extended an investment facility to PineBridge Benson Elliot for the Diuna Office Park in Warsaw
The hotel market in Bucharest continued its recovery in 2024
while the ADR has finally surpassed the milestone of EUR 100
Torus has announced its All.inn students’ residence concept that is soon to appear on ul
BIG Poland has acquired the Multishop Suwałki retail park comprising 13,000 sqm of retail space
The company now owns nine fully commercialized retail parks in Poland
Slate Asset Management has sold three OBI retail stores to the Lindner Group from Germany
Cushman & Wakefield has conducted a survey
the findings of which are presented in the report From Shopping to Experiences: A Customer’s View on Shopping Centres and Retail Parks
Cushman & Wakefield notes that despite evolving shopping trends
both retail formats continue to hold strong appeal
Multi Poland has taken on the management of the Galeria Przymorze shopping centre in Gdańsk
The store offers lifestyle and sporting clothing and is to open this spring
According to the "Quo Vadis E-commerce" report released by Cushman & Wakefield
the online commerce continues to be a growth driver for the industrial & logistics real estate sector
generating significant opportunities for developers and investors
the investor behind the Projekt Góraszka shopping and entertainment complex in Wiązowna on Warsaw’s eastern outskirts
has obtained a building permit for a mixed-use development
Poznan-based company Scallier is opening another facility under the Funshop Park brand in Romania
According to the latest report “At a Glance: Modern Retail Market in Poland
Q4 2024” from BNP Paribas Real Estate Poland
Poland’s retail market experienced record growth in 2024
Cushman &Wakefield has summarised the situation on the Polish retail market
Over half a mln sqm of new retail space came on stream last year
marking the highest new supply level in Poland since 2015
This robust development activity occurred amid rising demand from new retailers and improving consumer sentiment which boosted retail sales
A new retail park with a total area of 24,000 sqm is set to be developed in Otwock under the name Świderek
The investment will be led by Redkom Development
Empik has opened a flagship store in the revitalised former Cepelia pavilion in the centre of Warsaw
the modernist building has regained its former glory and once again impresses with its original appearance and modern interior
Trei Real Estate Poland has opened its 40th Vendo Park
The investment was created in Wrocław and has 5,000 sqm
Vendo Park Wrocław is the first facility under this banner in the capital of Lower Silesia
The retail park was built on a plot of approx
An 800 sqm Biedronka grocery store is to open on the ground floor of the Moje Bielany residential complex
which is being developed by CeMat A/S at ul
Wólczyńska 121 in Warsaw’s Bielany district
Spring has very much sprung and everywhere is bathed in the first warm sunshine of the year
I have in the back of my mind the terrifying fo ..
The Polish warehouse market has finally stabilised after the post-pandemic boom
but new challenges and opportunities are on the horizon for the sector
UBM Development has been given the go-ahead for the first wooden office building in Poland: Timber Park in Poleczki Business Park in Warsaw
The office market in Warsaw is currently experiencing a period of stability in terms of supply and take-up
Recent data on overall tenant activity indicates that clients in the cap ..
Receive all the latest information from the world of real estate by e-mail
the construction of the Aura residential building
designed by Robert Konieczny's office KWK Promes
According to a report by research company Spectis “Construction companies in Poland 2025-2030”
the total revenues of the 300 leading construction gro ..
The Globalworth Foundation has provided the authorities in Bucharest with office space for a Covid vaccination centre
Panattoni BTS and Commercecon together support the establishment of the second Centaurus Foundation centre in Poland to help horses and other animals
intends to focus on operations in other reg ..
Six class A office buildings in the PRO Portfolio
which is jointly owned by PineBridge Benson Elliot and Sharow Capital have been granted BREEAM In-U ..
Who won this year's 14th edition of the Eurobuild Awards
The jury and guests gathered at the Double Tree by Hilton hotel in Warsaw chose this year's ..
Enjoy the last set of recordings with comments straight from this year's MIPIM
we asked experts from our home country for their input
will take place on 9-10 April 2025 at the Norblin Factory Event Hall in W ..
we invite you to hot episode of the "Eye to eye" podcast
The UN Nansen Refugee Award award will go to Poland for the first time
According to the office of the UNHCR High Commissioner this year's regional wi ..
Czech developer CTP has been granted a EUR 200 mln loan from the European Investment Bank for the roll-out of its large-scale solar panel installation ..
while the ADR has finally surpassed the milestone ..
Jarosław Szanajca plans to resign from the position of president of the management board of Dom Development at the end of the year and join the superv ..
The Polish and Danish governments have entered preliminary discussions for the construction of a tunnel between Szczecin and Copenhagen underneath the ..
Viterra has moved into its new 1,500 sqm offices in Olivia Prime
part of the Olivia Centre business complex in Gdańsk
Panattoni has acquired two properties near Gothenburg
The brownfield sites will be replaced by a modern 43,000 sqm facility
Contemporary cities are grappling with the challenge of fostering dynamic growth while alleviating environmental pressures
Colliers has taken over the management of the Studio B office building located in the Warsaw Wola district
The property is owned by Stena Real Estate ..
The University of Warsaw has signed a contract with the general contractor for a project at ul
The new building will house the faculti ..
Velis Real Estate Tech is officially changing its name to Singu
adopting the title of its property management product
the construction of the Panattoni Park Unterfranken has officially started