Kärnfull Next said the feasibility study began in May
and preliminary results suggest that the Studsvik area "has favourable conditions" for hosting commercial SMRs
and societal feasibility of flexible and state-of-the-art nuclear power production at the site"
Studsvik said its Nyköping site is in a strategic location and houses the company's broad expertise in nuclear technology
reactor analysis software and fuel optimisation
decommissioning and radiation protection services as well as technical solutions for handling
conditioning and volume reduction of radioactive waste
The partners said that provided the feasibility study indicates favourable conditions - not least as regards local acceptance - key decisions regarding financing
permitting and power purchase agreements with off-takers will be made in the second half of 2024
"With its extensive expertise in the nuclear technology sector
Studsvik is the perfect partner for us"
said Kärnfull Next CEO and founder Christian Sjölander
"The Studsvik site seems to be well suited to become Sweden's first new nuclear power site
Our vision is that one of Europe's first SMR parks can be taken into operation here already in the early 2030s
Having several small reactors creates future-proof jobs and opportunities for co-location with other high-tech industries."
"Kärnfull Next has established itself as a reliable and innovative partner with solid expertise," said Studsvik CEO Camilla Hoflund
"We welcome the partnership and look forward to the outcome of the feasibility study
At present it is too early to say what this may mean for Studsvik
as the conditions have not yet been fully investigated and there are many years left before a possible establishment of an SMR at the Studsvik site."
Kärnfull Next signed a memorandum of understanding with GE Hitachi Nuclear Energy on the deployment of the BWRX-300 in Sweden
Swedish lead-cooled SMR technology developer LeadCold - a spin-off from Royal Institute of Technology in Stockholm - announced it was to conduct a feasibility study on the construction and operation of a demonstration SEALER (Swedish Advanced Lead Reactor) with associated infrastructure for fuel fabrication at Studsvik's site in Studsvik
Sweden's Radiation Safety Authority presented its final report to the government on how the regulatory framework for nuclear power should be developed and what other measures may be needed for nuclear power to be expanded in the country
The assignment included identifying the need for development of the rules or other measures that can affect the conditions for the use of existing and new nuclear power
MOU is one of a number of recent agreements on possible reactor build
Sweden-based nuclear technology company Studsvik has signed a memorandum of understanding (MoU) with Nordic energy company Fortum to explore the possibility of new nuclear at the Studsvik site outside Nyköping in southeast Sweden
Studsvik said it wants to support the climate transition and in the long term sees the possibility for new nuclear power at its site
research reactors or a combination of both
Studsvik said its role will be to make land available and contribute with its expertise
It would not to build or operate nuclear power plants on its own
The goal for the first phase of the MoU is to identify potential business models and technical solutions for further development
The MoU is part of a Fortum nuclear feasibility study
technological and societal conditions both for SMRs and conventional large reactors in Finland and Sweden
The study is also looking at new partnerships and business models
Fortum operates the two-unit Loviisa nuclear power station in Finland and jointly owns the three-unit Olkiluoto in Finland
Oskarshamn-3 in Sweden and the three-unit Forsmark in Sweden
In August, Swedish SMR project development company Kärnfull Next announced plans for its first nuclear new build site at Nyköping – a site it wants to turn into an “SMR campus” by the mid-2030s
The company said it had signed a MoU and attained prospecting rights to explore the potential for commercial nuclear energy production at an industrial site owned by Studsvik at Nyköping
Kärnfull Next signed an MoU with GE Hitachi Nuclear Energy on the deployment of the BWRX-300 in Sweden
Fortum has signed a number of agreements on potential new nuclear. In June it signed agreements with US-based Westinghouse Electric Company to study the possibilities for the development and deployment of AP1000 and AP300 nuclear power reactor projects in Finland and Sweden
Swedish lead-cooled SMR technology developer Blykalla is to conduct a feasibility study on the construction and operation of a demonstration Sealer (Swedish Advanced Lead Reactor) with associated infrastructure for fuel fabrication in Nyköping
Fortum has also signed agreements with South Korea’s Korea Hydro & Nuclear Power and Helsinki-based utility Helen Energy
Swedish Logistic Property (SLP) has today acquired and consolidated a fully let logistic property in Nyköping
comprises about 168,000 sqm and has a lettable area of about 55,000 sqm
a 10-year triple-net rental agreement is signed with Hedin Parts & Logistics AB
”We are very pleased to have acquired this property in an off-market-transaction as well as having signed a rental agreement with a stable and long-term tenant that will use the whole property
There are great opportunities to both refine the property
as well as carry through an expansion over time”
is built 1976 and is today used as Hedin Group’s central warehouse
The acquisition is carried out through a corporate transaction at an agreed property value of 440 MSEK
The transaction is financed through secured bank financing and own funds
SLP – Swedish Logistic Property – is a Swedish real estate company with a focus on logistics properties
the company has maintained a high pace and in a short time has completed several high-profile acquisitions
SLP has a high ambition regarding sustainability and works responsibly from environmental perspectives
The company’s property portfolio comprises a lettable area of approximately 810,000 square meters
SLP’s share of series B is listed on Nasdaq Stockholm
Your browser is out of date and potentially vulnerable to security risks.We recommend switching to one of the following browsers:
The MoU is part of Fortum's nuclear feasibility study launched in October 2022
and regulatory conditions both for small modular reactors (SMRs) and conventional large reactors in Finland and Sweden
The study also investigates new partnerships and business models
The agreement with Studsvik initiates a process with the aim of assessing the potential to construct new nuclear at the Nyköping site
the goal is to identify potential business models and technical solutions for further development
Studsvik has previously said its Nyköping site is in a strategic location and houses the company's broad expertise in nuclear technology
there is a possibility for new nuclear power on the Studsvik site
research reactors or a combination of both," Studsvik said
Studsvik's role will be to make land available and contribute with its expertise in various areas - not to build or operate nuclear power plants on its own."
"Studsvik is positive to new nuclear as a part of the green transition
and plannable electricity production," said Studsvik President and CEO Camilla Hoflund
"We welcome Fortum as a partner to investigate the possibility of establishing new nuclear on the Studsvik site
which is a classic nuclear area with an infrastructure already adapted to nuclear operations."
Fortum said the agreement "supports its strategic priorities to deliver reliable and clean energy and to drive decarbonisation in industries by providing clean energy and CO2-free solutions to its customers"
"A lot of new electricity generation will be needed across the Nordics to meet future electricity demand in our societies and industries," said Laurent Leveugle
"I am very satisfied as this agreement shows our ambition to support Sweden's green transition in the long-term."
The MoU between Studsvik and Fortum will run in parallel with earlier announced agreements with Kärnfull Next and Blykalla (formerly known as LeadCold)
Studsvik signed an MoU with Swedish SMR project development company Kärnfull Next
which is investigating the possibility of constructing and operating SMRs at Nyköping
Swedish lead-cooled SMR technology developer Blykalla is to conduct a feasibility study on the construction and operation of a demonstration SEALER (Swedish Advanced Lead Reactor) with associated infrastructure for fuel fabrication in Nyköping
Fortum has signed cooperation agreements with Westinghouse
Kärnfull Next as well as Finland's Outokumpu and Helen Energy
Small modular player Kärnfull Next plans commercial campus at Nyköping
Swedish nuclear company Kärnfull Next has announced plans for a campus of small modular reactors (SMRs) on the Swedish coast
The company plans to build the campus at a site in Nyköping
where nuclear software firm Studsvik currently operates test reactors
including the type of data center partners the company hopes to engage with
Kärnfull is a proponent of SMRs
which are promoted as a way to reduce the cost and delivery problems of traditional large nuclear projects
SMR providers, including Rolls-Royce in the UK and Nuscale in the US
argue that nuclear provides carbon-free energy which must be part of any plan to decarbonize society
The smaller reactors have power outputs around 300MW
It is hoped that the planning and approval process for nuclear can be made shorter by this level of standardization
The company began a feasibility study in May for using Studsvik's site
it has signed a memorandum of understanding to explore the potential for commercial nuclear energy production there
“With its vast expertise in the nuclear technology sector
Studsvik is the perfect partner for us," says Christian Sjölander
"The Studsvik site seems to be well suited to become Sweden’s first new nuclear power site
Our vision is that one of Europe’s first SMR parks can be taken into operation here already in the early 2030s
Having several small reactors creates future-proof jobs and opportunities for colocation with other high-tech industries."
“Kärnfull Next has established itself as a reliable and innovative partner with solid expertise," says Camilla Hoflund
“We welcome the partnership and look forward to the outcome of the feasibility study
as the conditions have not yet been fully investigated and there are many years left before a possible establishment of an SMR at the Studsvik site.”
The company is still checking on aspects such as financing
and the possibility of power purchase agreements with power off-takers
and expects to finalize some decisions on all that towards the end of 2024
According to a release in Architects Journal
Instance Architects has been signed up as the potential architect for the eventual project
Instance director Ian Macdonald said: ‘The Studsvik SMR Campus as envisaged will be a game changer
demonstrating how the data center - nuclear nexus solves the issue of growing computing electrical demand with a resilient decarbonized supply."
In the US, Green Energy Partners has plans for a site with multiple SMRs in Surry County in Virginia
This project is being sited on a vacant lot next to an existing large nuclear power station
Data Centre Dynamics Ltd (DCD), 32-38 Saffron Hill, London, EC1N 8FH Email. [email protected]DCD is a subsidiary of InfraXmedia
The Municipality of Nyköping yesterday decided on a new large zoning plan for the area close to the railway station Nöthagen in Nyköping
the new district will in its first phase be completed with housing
a school and elderly care homes totalling 160,000 GFA
Samhällsbyggnadsbolaget i Norden AB (publ) (”SBB”) owns and is driving the development of a new district in Nyköping
The Nöthagen area is being transformed from an industrial area into a new district with housing
the zoning plan enables approximately 1,600 homes
New public squares and a large public park are included in the zoning plan
Parts of the industrial buildings of cultural and historical interest are preserved and combined with the new buildings
The meeting between old and new becomes an important part of Nöthagen’s identity
primary schools and also higher education such as upper secondary school or post-secondary education are planned
The housing units can accommodate elderly care homes
rent regulated residentials and condominiums
“Nyköping is a growth municipality that is centrally located in the Mälardalen valley and will
be an important part of the development in the Mälardalen area
With Nöthagen’s location directly adjacent to the new railway station
the area will be attractive for both local and regional commuting
The development in the area is completely in line with SBB’s sustainability goals”
Deputy CEO of Samhällsbyggnadsbolaget i Norden AB
Krister Karlsson, Deputy CEO, Samhällsbyggnadsbolaget i Norden AB, [email protected]
Samhällsbyggnadsbolaget i Norden AB (org.nr 556981-7660) (”SBB” or ”we”)
need personal data about you in order to send you press releases
We need your email address and choice of press releases
The legal basis for our processing of your personal data is your consent
You have the right to withdraw your consent at any time by clicking ”unsubscribe” in the newsletter or by contacting us at [email protected]
Please note that the withdrawal of consent does not affect the lawfulness of processing based on consent before its withdrawal
The personal data is stored as long as you consent to the processing
For more information on our processing of personal data, see our Personal Data Policy
Europe's first park for small modular nuclear reactors
might be located in the Studsvik area near Nyköping
"It was essentially a crazy decision," John Ahlberg told Warp News just over a year ago
Leaving a successful career to build new nuclear power
Recently, they received an investment from a European climate fund
and now they are presenting plans to build Europe's first SMR park in Studsvik
"The Studsvik area seems well-suited to become Sweden's first new nuclear facility outside the existing three
Our vision is that one of Europe's first SMR parks can be operational here by the early 2030s
with a number of small reactors producing both clean energy and new climate-positive
highly qualified jobs," says Christian Sjölander
"Kärnfull Next has established itself as a reliable and innovative partner with solid expertise," says Camilla Hoflund
Studsvik was founded in 1947 as AB Atomenergi with the mission to build nuclear power in Sweden
the publicly traded company offers a range of technical services to the global nuclear industry
including software for core monitoring and fuel optimization
Kärnfull Next has been conducting a study of the area and the prerequisites for an SMR park
and the preliminary results suggest that the area is well-suited for this
Read our previous interview with the co-founder
about the background and vision for Kärnfull Next
you help in the creation and sharing of fact-based optimistic news all over the world
Solar energy and battery storage will account for 81 percent of the total capacity increase
with solar energy representing over 50 percent
The US will decommission twice as much coal power capacity this year compared to last year
Broadband Jesus waited until one week after Easter to resurrect
By subscribing, I confirm that I've read and agree to the Cookies & Privacy Policy.
regarding Sweden's aerial firefighting capabilities
The contract is valid during the years 2020-2023
The order is for the capability to fight fires with two firefighting aircraft
Under the contract there is also the opportunity to trigger an option for two more aircraft
This resource will be available for Sweden and for EU
established aerial firefighting capabilities
using the Air Tractor AT-802 F firefighting aircraft
with the associated pilot and technician skills
as well as the specific permits for their operation
"We are part of Sweden's national security and our specialist expertise and flight permits made it natural for us to complement our operations in Nyköping with aerial firefighting capabilities," says Ellen Molin
Head of Saab's Support and Services business area
"It is important to have a prompt national response to forest fires
and this service is going to help deliver that."
The AT-802 F is a water-bombing aircraft that in the event of a forest fire can release 35,000-50,000 litres of water per hour
The firefighting aircraft will be based in Nyköping
where Saab already has aviation operations for
aerial target towing and support for the Swedish Coast Guard’s aircraft
firefighting aircraft can within two hours reach Copenhagen or eastern Finland and within three hours
the firefighting aircraft can be based at another location with advanced technical and maintenance resources
by Babak Taghvaee These aging Polish-made crop dusters have been in use by the HAF's 359 Public Services Air Support..
by Babak Taghvaee Designed and built to be the Soviet Union's main aerial firefighter aircraft
by Babak Taghvaee Leonardo has enhanced its C-27J Spartan transport aircraft with firefighting capabilities to meet the needs of some..
With New South Wales (NSW) and Queensland both hit by a severe storm cell which had originally been a cyclone..
Museums have no borders,they have a network
Head of Collections at Sörmlands museum in Nyköping
Museum Collections in “Narrative Storages” – New Ways of Connecting with Cultural Heritage
The play with secrecy can be an important factor in drawing the public’s attention to museums and exhibitions
We thus need to widen access to collections
In this article I will argue that museum collections can be made more accessible
I will use the “Narrative Storages” of Sörmlands museum in Nyköping
as an example of a new possible format for museum collections
The vast majority of museum collections is usually kept in storages that are neither in the vicinity of the museum itself
if museums want to make better use of their collections and allow the public to engage with them
new ways to improve accessibility must be found
It is necessary for museums to have a holistic approach and to think of “collecting” and “making use of the collections” as one
What good are these collections if people cannot come in touch with their cultural heritage
opened a new museum building which houses exhibitions
offices and storages for their entire collection – which comprise around 80000 objects
1 million photos and 400 shelf meters of archival material
Sörmlands Museums Narrative Storages © Sörmlands museum
As a second step to revive interest in its collections
Sörmlands museum placed the storages at the heart of the museum and named them “Narrative Storages”
The museum had the rather rare opportunity to create a new building
and early in this process decided to make use of its biggest resource: its collections
They were made the center-piece of the new house with the construction of visible storages situated in the middle of the building
Visible storages within a museum’s main building might be nothing new
the way that Sörmlands museum structured and presented its contents
Taking the previously mentioned digital work with the collections as starting point
Sörmlands museum wanted to display its objects according to that structure
It was no longer the objects themselves (prioritizing material
object category or form) that were the main criteria of the ordering structure
but the narratives and biographies of the people connected to the objects
Instead of being confronted by hundreds of anonymous chairs or an army of plates
a photo album and a pen that have a common provenience next to each other
The objects are displayed in a more organic way and historical/social contexts become clearer
and visitors can “meet” human beings instead of “merely” things
The new storages are in the borderland between traditional storage and exhibition
Although the collections are curated to a certain extent
nothing is added or subtracted from a sub-collection’s or narrative’s original form
The storages can be entered for free with a guide
each guide focusing on different narratives or topics
visitors can see big parts of the collections through floor to ceiling windows and receive information about them via screens placed along the galleries
The digital content also focuses more on personal biographies than on the explanation of individual objects
the museum has been able to encourage more people to contribute their own stories
Especially individuals and groups who have been underrepresented in major social narratives
Visitors become more aware of the purpose of museum storages and their collections
They can see beyond the objects and are more interested in
and curious about donating items to the museum if they know that it is not “merely” an object but their personal stories that will be preserved and shown there for generations to come
NATO is about to kick off its largest military exercises since the Cold War
which will include more than 50,000 troops from 31 countries
The military exercises, known as Trident Juncture 2018
One of the countries participating in the exercises is non-NATO member Sweden
which has grown increasingly concerned about neighboring Russia
especially after Moscow apparently targeted it during a simulated nuclear strike in 2013
and even held a large joint military drill with the US two months before that
Sweden is bringing about 1,900 troops to Trident Juncture 2018
along with two stealthy Visby-class corvettes
The two corvettes will be integrated into Standing NATO Maritime Group One
which is basically NATO's standing frigate force
a public affairs officer for the Swedish Navy
The corvettes are mainly designed for anti-submarine warfare and mine countermeasures
but the Karlstad is used more as an attack and anti-surface warfare vessel
Source: naval-technology.com
The Visby-class is designed to minimize radar signals
Airport operator Vinci Airports has sold 90.1% of Stockholm Skavsta Airport in Sweden to real-estate developer Swedish Arlandastad Group
which will use 484ha of the land to build solar-power farms
The agreement is expected to be completed by April 2022 and the development will be undertaken in partnership with the municipality of Nyköping in Sweden
build and maintain one solar farm on the airport site
which will cover 100ha and have a capacity of almost 100MWp
it will help supply energy to the municipality of Nyköping
CEO of Vinci Concessions and president of Vinci Airports
“This double success marks both a structuring step for Vinci Concessions’ photovoltaic business and the continuation of our airport strategy
based on investing in assets with high growth potential
We are very pleased to be working with Arlandastad Group
a sound partner to the Nordic photovoltaic market
and a company that will continue the development initiated by Vinci Airports at Stockholm Skavsta
in partnership with the municipality of Nyköping.”
“This project suits us perfectly; it has the same potential as our project in Arlandastad
Nyköping has a very attractive location with proximity to Stockholm
the Baltic Sea’s deepest port in Oxelösund
The first stage includes an expanded project portfolio of between Skr5bn and Skr10bn [US$0.5bn to US$1bn]
a significant addition to our existing project portfolio
which prior to the acquisition amounts to approximately Skr40bn [US$4bn].”
“Stockholm Skavsta airport is important for the growth in the region
We appreciate the close cooperation we have had with Vinci Airports these past years and are now looking forward to continuing to develop the airport area together with Arlandastad.”
Bert Bolin (1925–2007) was born in Nyköping
He became interested in meteorology at an early age inspired by his parents
Bert made fundamental contributions to both numerical weather forecasting and to the science of biogeochemical cycles
IPCC
Department of Meteorology (MISU)
This year it will be like this (with the venue inbetween brackets):
We always look forward to seeing our viewers in arenas all over the country and these hosting cities and audience have also welcomed us with open arms in previous years
Here is a quick overview of where Melodifestivalen has been since it started touring in 2002:
The tickets for both the rehearsals and the actual live shows will go on sale Wednesday the 31st of October at 9:00 CET
Lindsay Dracass – ‘I am part of a beautiful Eurovision family’
Glennis Grace makes it to the Finals of America’s Got Talent!
and website in this browser for the next time I comment
Δdocument.getElementById( "ak_js_1" ).setAttribute( "value"
Open in Spotify
to get all the Eurovision news as they happen
Anglo-Dutch practice Instance Architects is drawing up plans for Europe's first Small Modular Reactor (SMR) campus
The nuclear power plant is planned for the small town of Nyköping
on behalf of energy development company Kärnfull Next
SMRs are advanced nuclear reactors with a power capacity of up to 300 MW(e) per unit
about a third of the generating power of a normal nuclear power reactor
They are physically a fraction of the size, but can produce a large amount of low-carbon energy, according to the International Atomic Energy Agency
Instance
is an experienced designer of Gigawatt and SMR nuclear facilities
‘has the potential to become a significant climate-focused employer’ for the town and neighbouring areas
The architect said it hoped ‘key decisions’ on financing
permission and power purchase agreements (PPAs) for Nyköping would be made by Kärnfull Next and nuclear analysis software provider Studsvik AB in the second half of 2024
‘provided the technical studies continue to show promise and the project gains local acceptance’
Instance is also collaborating with power company GE Hitachi on a series of SMR plants for North America
The practice’s director Ian Macdonald said: ‘The Studsvik SMR Campus as envisaged will be a game changer
demonstrating how the Data Center - Nuclear Nexus solves the issue of growing computing electrical demand with a resilient decarbonised supply
‘As we are undertaking studies during 2023 not all aspects/consultants are known or appointed.’
Kärnfull Next founder and chief executive Christian Sjölander said the new SMR park would ‘create future-proof jobs and opportunities for co-location with other high-tech industries’
The designers and developers say not all aspects and consultants on the project are currently firmed up
and they will continue to undertake studies throughout 2023
TagsInstance nuclear power Power station Sweden
Tokyo-based architects Kazuyo Sejima and Ryue Nishizawa of SANAA chatted to the…
Skyscraper expert SimpsonHaugh has submitted plans for a 50-storey and a 25-storey…
MVRDV and Mecanoo are among five finalists vying to design…
Squire & Partners has finally won planning
This webpage uses Cookies and JavaScript in order to work properly
We strongly recommend to enable those technologies in yur browser
In case of wrongly displayed content you can request necessary information at e-mail address wwwadmin@mzv.cz
Czechs and Slovaks from all parts of Sweden enjoyed the performance Pánská šatna of Ensemble Ypsilonka at Teater Sörmland in Nyköping on October 13
which was part of celebrations marking the 100th anniversary of the founding of Czechoslovakia
was organized by Čestmír Řanda and Rino Brezina
Ambassadors of the Czech Republic and Slovakia Mr Jiří Šitler and Mrs
Martina Balunová also attended the performance and had the opportunity to meet with the artists after the show
Both Ambassadors also met with mayor of Nyköping Urban Granström
They discussed September´s municipal elections and economic situation in the region
which offers technical solutions for nuclear reactors and represents one of the leading employer in the region has close ties with Czech company UJV Řež
Ambassador was also informed that from April 2019 there would be a direct flight between Nyköping´s airport Skavsta and Prague operated by Ryanair
If you are interested in receiving information about our events
Czechia to Send New Ambassador to Lebanon
"Czech Support to Ukraine Will Continue," Minister Lipavský Assured Ukrainian Foreign Minister Sybiha
World Press Freedom Day 2025
New Ambassadors to Jordan and Ukraine
Informationen på denna sida är avsedd för journalister
press och media.Klicka ja för att komma till nyhetsrummet
Klickar du nej kommer du tillbaka till mynewsdesk.com
– Production at NK’s workshops was an important chapter in Swedish design history
We are now presenting this as a complete narrative for the first time
Two years later – in 1904 – the workshops in Nyköping opened
and this is where furniture production for NK took place
when operations ceased and the final workshop staff vacated the premises
Shortly thereafter the buildings were torn down
the actual furniture lives on and with it memories of the skilled artisans and renowned designers associated with Nordiska Kompaniet’s furniture workshops
Sörmland Museum will be showcasing more than 150 items of furniture
from exclusive pieces exhibited at World Expos in the 1920s and 1930s to the popular Triva range
The collection also includes some of Sweden’s most renowned furniture classics
All the furniture in this exhibition was made in Nyköping
A third of the items come from Sörmland Museum’s own collection
while the other two thirds are on loan from institutions such as Stockholm Public Library and Stockholm City Hall
as well as several museums throughout Sweden
Fifteen of the pieces are on loan from private individuals
who have loaned us some totally unique items of furniture
which in a number of cases have never been on public display before
and at their peak around 500 persons worked here
The workshops attracted skilled craftspeople – including carpenters
polishers and gilders – from both Sweden and other countries
NK employed Sweden’s foremost architects and designers
but what was made here in the main was furniture and interior furnishings
ornate pieces for an exclusive target group
but later NK was the first in Sweden to offer self-assembly
There were also many large and prestigious interior design projects – including Konserthuset Stockholm and several rooms at the City Hall in Stockholm
operations ceased at NK’s workshops in Nyköping
Tolagsgatan 8 in Nyköping on Saturday 11 March
A free bus service will be departing from Stockholm at 08:45
If you wish to attend, please contact Marketing Officer Malén Eneberg, +46 (0)72-083 87 71, malen.eneberg@regionsormland.se by 27 February
High-resolution photographs can be downloaded here: Sörmlands museum | Mediearkiv (mynewsdesk.com)
Sörmland Museum will be launching its NK furniture exhibition with a packed programme
In addition to the opening ceremony and talks about design history
there will be free introductions to the exhibition
A detailed programme for the opening weekend can be found at www.sormlandsmuseum.se/program
Sörmland Museum will be publishing NK:s möbler
richly illustrated with new photographs and unique archive material
The book will be available in three versions – with different covers
The book puts the furniture into a design history context and presents the team of people – designers
carpenters and upholsterers – behind some of Sweden’s best-known furniture classics
It takes the reader through trends within design and interior design
consumption patterns and lifestyles and how they have influenced the design process
The book will be on sale at a special price at Sörmland Museum on Thursday 9 March
It is available to pre-order now from the museum’s online store
Sörmland MuseumLead curator: Mikael Billborn
Sörmland MuseumExhibition design: Gabriella Lenke and Mattias Ståhlbom
TAFGraphic design: Moa Sundkvist and Jennifer Bergkvist
Ateljé GroteskAuthor of book and basic exhibition script: Sara KristofferssonBook editor: Matilda StannowPhotographer (new photos): Björn DahlgrenPartners: Nyköping Municipality and Nordiska Kompaniet ABThe project has received financial support from the Barbro Osher Pro Suecia Foundation
Estrid Ericsons Stiftelse and Stiftelsen Konung Gustav VI Adolfs fond för svensk kultur
Sörmland Museum arranges activities throughout Sörmland
the regional museum opened a new museum building at Tolagsgatan 8 in Nyköping
It houses permanent and temporary exhibitions
Sörmland Museum employs a unique concept – the museum’s collections are located in the heart of the building
fully visible behind glass walls and accessible to everyone through free guided tours
The collections are also arranged by context – e.g
workplace or institution – in order to communicate stories about and by people
Sörmland Museum was named Årets museum (Museum of the Year) by Sveriges Museer and ICOM Sweden
Sörmland Museum was nominated for EMYA – European Museum of the Year Award
The museum is normally open Tuesday to Sunday 10:00-17:00
Find out more about Sörmland Museum at www.sormlandsmuseum.se
Lena Landerberg, Exhibition Curator, +46 (0)76-724 91 85, lenakristina.landerberg@regionsormland.se
Malén Eneberg, Marketing Officer, +46 (0)72-083 87 71, malen.eneberg@regionsormland.se
väcka engagemang och bidra till att människor kan påverka samhället och sin livssituation
bild och form ger Sörmlands museum perspektiv på samtid och framtid
dagens och morgondagens samhälle och på hur det är
När du väljer att skapa ett konto och följa ett nyhetsrum kommer dina personuppgifter behandlas av oss och av ägaren av nyhetsrummet för att du ska kunna motta nyheter och uppdateringar enligt dina bevakningsinställningar
För att läsa mer om detta, var vänlig läs vår Integritetspolicy som berör vår behandling av dina personuppgifter, och Integritetspolicy för Contacts som berör behandlingen av dina personuppgifter från ägaren av nyhetsrummet du följer
Vänligen notera att våra Användarvillkor gäller alla våra tjänster.
Du kan dra tillbaka ditt samtycke när som helst genom att avregistrera dig eller genom att ta bort ditt konto.
attended the Thai Festival 2022Ambassador of Thailand to Sweden together with the Royal Thai Embassy’s officials and staff
attended the Thai Festival 2022 วันที่นำเข้าข้อมูล 22 Jun 2022
This website had been designed to be as accessible as possible to all and is certified by the WCAG 2.0 standard (Level AA)
** Best viewed with Chrome Version 76 up **
Source: ghanasoccernet.com
« Prev
Next »
Comments (0)
Listen to Article
Ghanaian player
Police have re-opened the area previously cordoned off in the Fågelbo area of Nyköping
after securing a car that is suspected to have links to the explosion in a flat on Monday
police announced they had identified the two men who died in the explosion in the Brandkärr area on Monday
The families of the two men have been informed
but police will not reveal any more details about them until Thursday
suspected to be connected to the explosion
but no explosives have been found in it.
suspected of serving as an accomplice in the preparations to commit devastation endangering the public
Christer Sjöqvist with the police in Södermanland told Expressen that the man is suspected on good grounds
He has been convicted of several violent crimes in the past
but police do not want to say if he has any connections to organised crime
The man himself denies any connection to the explosion
the police have been knocking on doors in the area
but also to answer questions from concerned neighbours
A total of 20-25 police officers have been working on the case on Wednesday
plus weekly summary on Fridays at 4.30pm on P2 (P6 89.6FM in Stockholm)
Kontakta gärna Sveriges Radios forum för teknisk support där vi besvarar dina frågor vardagar kl
Trains travelling between Kolmården and Norrköping were halted this morning due to the risk of a landslide
Trains between Stockholm and Norrköping have also been affected
There were also delays between Malmö and Stockholm this morning following an earlier accident
Radio Swedenenglish@sverigesradio.se
An artist was asked by Nyköping council to come and paint something on a wall in a new school that will open after the summer
What the council had overlooked was that the artist is famous for her pictures of intimate parts of the female body
which features a large vagina, was finished at the end of last week
The artwork has been spray-painted on a 12 square metre wall at the side of some stairs inside the new school in Nyköping
The artist Carolina Falkholt says it is a conceptual work of art
She considered the age of the pupils who will go to the school - 13-15 year olds - before scribbling common degrading words about women and their bodies on the wall
a feather-like pattern featuring the lower parts of a female body
Carolina Falkholt calls the piece "Övermålning" which means "to paint over"
The e-mail she got from the local council read: "Your painting is nice and has beautiful colours
But we are not happy with the object on it
Is it possible for you to come here and repaint it to something more subtle?"
"If is of course completely unacceptable to ask an artist to change her finished work of art
And I don't understand why they even ask an artist if all they want is an inoffensive decoration," says Carolina Falholt
a statement on the council website saying that the painting would be removed was replaced by a message saying no formal decision has yet been made about what they will do with the painting
But the Social Democrat chairman of the local council's children and youth section
told the newspaper Göteborgs-Posten that: "the painting is very nice
My motto is that the pupils should feel comfortable at school."
But Carolina Falkholt calls this "moral panic"
She says she thinks this is about the grown-up's fear of sexuality among young people
And perhaps their fear of sexual assaults and bullying
"The idea that it would be unsuitable at that age to think about your body and your gender I find that very
The debate has caused Sissela Björk of the Nyköping Youth Council to post a blog-message with the headline: "A vagina on the wall in the new upper secondary school
She argues that no-one seems to worry about the bare penis on a statue at another secondary school in the municipality and writes "the council's strong opinion against the painting makes me question their view of women and the female body
Carolina Falkholt says she hopes that the council in Nyköping will re-consider and keep the picture on the wall
so it is there when school opens after the summer
it seems the painting is welcome elsewhere
A gallery in Varberg has been in touch.
"If Nyköping does not want the painting
we are happy to buy it," says Lars Carlsson
Together with all youth clubs in Varberg
Carlsson is now offering SEK 40,000 to - as he says - "save this magnificent piece of art"
Swedish artist Carolina Falkholt, known for her vagina painting on a school wall in Nyköping, said on Thursday that she was attacked in Umeå while making a vagina mural on a block of ice
as part of the northern city's inaugural celebrations for its year as European Capital of Culture 2014
"He came up to me and pushed me so I fell over," Carolina Falkholt told Swedish Television SVT in Västerbotten
She claims she was forced to stop work after she was attacked by the unknown man
that she was still upset and could not understand why she was attacked
I was stood and was doing my job when this man hit me in the middle of the street and said "Why do you come here and destroy."
A blow to a woman is a blow to all women."
The man though later contacted the newspaper and said how he thought the artist was a vandal causing criminal damage. He described how he parked inside the city centre and saw a masked person stood and spraying a block of snow
He did not know that it was artist Carolina Falkholt
"F******g Vandal," I thought and just went up and asked why she was destroying something
It's so often you see how the place is vandalised but noone dares do anything." According to the man
he was worried when the person took a step toward him
thinking she would spray him in the face
He claims not to know of Carolina Falkholt's art nor that she was painting a vagina on a block of snow. "It was only a few strokes back and forth